
SPIRIT G XL 1-3KVA PF.09 - UPS www.visionups.com
43
FIG.27
Installation for battery pack
Testing New Batteries
To test new batteries:
1. Plug the UPS into a power outlet for 48 hours to charge the batteries.
2. Start up the UPS by pressing the start up combination button.
3. Press the battery test combination button to activate the battery test.
The UPS starts a battery test if the batteries are fully charged, the
UPS is in Normal mode with no active alarms, and the bypass voltage is acceptable.
During the battery test, the UPS transfers to Battery mode and discharges the batteries for 10
seconds. The LED indicators of the front cover stop cycling when the test is completed.
Recycling the Used Battery or UPS
Contact your local recycling or hazardous waste center for information on proper
disposal of the used battery or UPS.
WARNING
Do not dispose of the battery or batteries in a fire. Batteries may explode.
Proper disposal of batteries is required. Refer to your local codes for disposal
requirements.
Do not open or mutilate the battery or batteries. Released electrolyte is harmful
to the skin and eyes. It may be toxic.
CAUTION
Do not discard the UPS or the UPS batteries in the trash. This product contains sealed,lead‐
acid batteries and must be disposed properly. For more information, contact your local
recycling/reuse or hazardous waste center
CAUTION
Do not discard waste electrical or electronic equipment (WEEE) in the trash. For
proper disposal, contact your local recycling/reuse or hazardous waste center.