SPIRIT G XL 1-3KVA PF.09 - UPS www.visionups.com
17
FIG.17
Long backup external battery connection
1. Install the base, then place the RT UPS on the base one by one as Fig.16 shows.
2. The cover installation and cable connection of the UPS and EBPS are the same as RT. (To install the
optional EBP(s) for a UPS)
UPS Initial Startup
To start up the UPS:
NOTE
Verify that the total equipment ratings do not exceed the UPS capacity to
prevent an overload alarm.
1.
If optional EBPs are installed, verify that the EBPs are connected to the UPS.
2.
Plug the equipment to be protected into the UPS, but do not turn on the
protected equipment.
3.
Make any necessary provisions for cord retention and strain relief.
4.
Plug the detachable UPS power cord into the input connector on the UPS rear
cover.
5.
Plug the UPS power cord into a power outlet. The UPS front cover display
illuminates.
6.
The UPS will do self-test when power on. After that, the charger will charge
the battery. If the output displayed on LCD is “0”, there is no output. If you
need the UPS output the utility without starting the UPS when plug into the
utility,you need to set bPS option to “ON” on the setting mode, refer to
Page 26.
7.
Press the combination start up buttons on the UPS front cover for at least half a
second. The UPS will start up and the LED will turn on and off sequentially.
8.
Check the UPS front cover display for active alarms or notices. Resolve any active
alarms before continuing. See Troubleshooting” on page 49. If the
indicator is on, do not proceed until all alarms are clear. Check the UPS
status from the front cover to view the active alarms. Correct the alarms and
restart if necessary.