SPIRIT G XL 1-3KVA PF.09 - UPS www.visionups.com
14
FIG.13
Typical EBP Installation
7.
Replace the EBP front cover.
To replace the cover, verify that the EBP cables are routed through the EBP cover knockouts, cover
connects with the cover hook near the left side of the EBP cabinet. Repeat for each additional EBP.
It is the same with the installation of the front cover. (Refer to “UPS installation”)
8.
Verify that all wires connected between the UPS and EBP(s) are installed behind the front covers
and not accessible to users.
9.
Return to Step 4 to continue the UPS installation.
Rackmount converted to Tower Installation
1
.
Rackmount converted to Tower plastic base installation
① two plastic base brackets
② flatten it after intercrossing
intercross as following FIG.
FIG.14
plastic
base installation