1717 W Civic Drive, Milwaukee, WI 53209
414-354-6600
Design Modification Rights Reserved
© 2018 Visa Lighting
When using electrical equipment, basic safety precautions should always be followed, including the following:
•Read all instructions carefully before installing and save for future use.
•Make sure all connections are in accordance with the National Electrical Code and local regulations.
•To avoid possible electric shock, be sure the power supply is turned off before servicing or installing the fixture
•Service should be performed by qualified personnel.
•These instructions may not cover all details or variations. If additional information is needed, please contact Visa Lighting.
!
Model: CV2424
Linesse Linear Slot
Publication: 762302XX
Document Description: Installation Instructions
for 3” Linesse Linear Recessed
Series Luminaires
5
INSTALLATION INSTRUCTIONS FOR MOUNTING
IN HARD CEILING AND JOINING FIXTURES
1. Prepare wall/ceiling with proper
rough-in width openings (see chart
on page 3).
2. For post sheetrock applications use 5/8”
holes on back of fixture. Tie into the
building with 1/4” all thread rod
(supplied by others).
3. Install building power feed conduit
and fitting (supplied by others) through
top side of housing or thru end cap of
1st fixture in the continuous run. Make
the electrical connections to the building
power using the starter harness and plug
into the fixture thru harness. Use the wiring
diagram included to identify wiring.
4. Insert fixture thru rough-in opening
and fasten fixture (hardware supplied
by others) to building studs.
•
Center fixture in opening
•
Predrill holes for screws and
countersink 3/16” for “Trimless”
fixture (if needed)
Rough-In
Width
Flange
Rough-In
Width
Building Power Feed
Slider Channel
Predrill mounting holes
in slider channel
Predrill and countersink
mounting holes
(if needed)
Do not over tighten
All Thread (supplied by others)
Post sheetrock applications
Flangeless
Trimless/Flangeless
Flange
3-11/16”
3-11/16”