![virtual access GW8600 Service Managed Gateway Installing And Configuring Download Page 7](http://html1.mh-extra.com/html/virtual-access/gw8600-service-managed-gateway/gw8600-service-managed-gateway_installing-and-configuring_1030132007.webp)
2: Physically installing the GW8600 SMG
Installing and Configuring the GW8600 SMG
© Virtual Access Ltd.
Issue 1.1
Page 7 of 12
Connect a mains cable to the TB4 connector on the PSU. The TB4 connector is directly
above the knockout hole on the bottom of the box. Use a cable that meets the
specifications in Table 1.
Insulation
Doubly insulated
Secondary insulation
PVC
Conductor make up
30/0.25 mm
Conductor CSA
1.5mm
2
Cable type
3183Y
Table 1: Specifications for the 3-core mains cable
2.6
Reattaching the battery
1.
Attach the red lead from the PSU to the red (+) contact.
2.
Attach the black lead from the PSU to the black (–) contact.