Chapter 2 Assembly and installation guidelines
Manual VIPA System 300V
2-4
HB130E - IM - Rev. 08/26
Installation at the profile rail
You may install the System 300V as well horizontal as vertical. Please
regard the allowed environment temperatures:
•
horizontal structure:
from 0 to 60°
•
vertical structure:
from 0 to 40°
The horizontal structure always starts at the left side with the power supply
and the CPU, then you plug-in the peripheral modules beside to the right.
You may plug-in maximum 32 peripheral modules to the CPU.
PWR
RUN
STOP
SF
MMC
FRCE
DESL
RUN
ERR
DE
IF
MMC
RUN
STOP
MRES
PLC
X1
VIPA Muster
PB-M
X5
X2
X3
PS
DVI
CF
MPI
PB-DP
CPU 317-BM
X 2
3 4
+
-
+
-
DC 24V
VIPA 321-1BH00
DI 16xDC24V
X 2
3 4
.0
.1
.2
.3
.4
.5
.6
.7
.0
.1
.2
.3
.4
.5
.6
.7
SM321
VIPA 307-2EA00
PS 307/6
X 2
3 4
IN AC 100-240V
1.3-0.6A
50-60Hz
OUT DC 24V/
∑
Ι:6
A
9A (peak)
L
N
PE
G
X2
X1
DC24V
DC24V
+
-
+
-
OH
OL
OK
OFF
ON
Power Supply
I/O Periphery
CPU
The vertical structure is turned for 90° against the clockwise direction.
PW
R
RU
N
ST
O
P
SF
MM
C
FR
C
E
D
ESL
RU
N
ER
R
DE
IF
MMC
RU
N
ST
O
P
MR
ES
PL
C
X1
VI
PA M
u
st
e
r
PB-
M
X5
X2
X
3
P
S
D
V
I
C
F
M
PI
PB-D
P
CP
U 317-
B
M
X2
34
+
-
+
-
DC
2
4
V
V
IPA
32
1-
1B
H
0
0
DI
16x
DC2
4V
X2
34
.0
.1
.2
.3
.4
.5
.6
.7
.0
.1
.2
.3
.4
.5
.6
.7
S
M
321
VI
PA 3
0
7
-2
EA0
0
P
S
30
7/
6
X2
34
I
N
A
C
100
-240V
1.
3-
0.6A
50
-60H
z
OU
T
D
C
2
4
V
/
∑
Ι:6
A
9A
(
pea
k
)
L
N
PE
G
X2
X1
DC2
4V
DC2
4V
+
-
+
-
OH
OL
OK
OF
F
ON
P
o
we
r Su
pply
I/
O
Pe
riphe
ry
CP
U
Structure: