7
901189 REV D 02/02/17, INST 55-59 CHEV P-UP w/ STANDARD CONTROLS EVAP KIT PG 7 OF 24
Figure 2
OEM Defrost
Ducts
OEM Heater
Assembly
Glove
Box
OEM
Control
Panel
(Remove)
Passenger Side
OEM Vent Control
(Relocate)
Driver Side
OEM Vent Control
Glove Box
Door
Figure 2b
Figure 2a
Approx.
3”
Cut &
Remove
After
Bend
Bend
1/2”
Passenger Side
Fresh Air
Door
Silicone
Passenger Compartment
Disassembly
1.
2.
3.
4.
5.
6.
7.
8.
9.
Perform the Following:
Remove the glove box door (retain) and glove box (discard).
Disconnect all wires and cables from the control panel.
Remove the control panel (discard).
Remove the passenger side OEM vent control (discard), and close and seal the kick panel vent with silicone
(See Figure 2b, below).
Relocate the driver side OEM vent control next to the steering column using OEM screws (See Figure 2, below).
Remove the OEM heater assembly (discard).
Remove the OEM duct hoses from the defrost ducts (discard).
Remove the OEM defrost ducts (discard).
Modify the passenger side glove box door arm as shown in Figure 2a, below. NOTE: Glove box door travel
will be restricted to prevent interference with evaporator case assembly.
Remove & discard the driver side glove box door arm.
10.