12
EAM2, EAM3
IT
8-
Secure the bracket to the pillar, following the dimensions given in the table.
Secure the bracket for anchoring the gate leaf (see dimension E in the table)
9- Mounting the actuator:
Position the actuator, secure the anchoring screw and check the actuator level.
F1
F2
F3