10
2.
Apply adhesive all around the plug. Insert plug.
Note
Adhesive drying time: 24 hours
3.
4.
Fig. 7
Connections on the heating water side
Note
Install all pipe connections free of load and torque
stress.
G
A
B
CDF
H
Fig. 8
90 to 270 kW
A
Boiler return, DN 65
B
Female connection for Therm-Control temperature
sensor (NTC 10 k
Ω
), R
½
C
Female connection for pressure gauge, R
½
D
Safety connection (safety valve)
F
Boiler flow, DN 65
G
Female connection for boiler water temperature
sensor, high limit safety cut-out and temperature
controller
H
Drain, R 1
¼
Combustion chamber sight glass
(cont.)
5457357