7
2.
1.
E
Fig. 3
1.
Insert adjusting screws
E
into the base rails.
Note
The adjusting screws and sight glass closure can
be found inside the combustion chamber.
2.
Level the boiler horizontally. No special founda-
tions are required.
Note
We recommend siting the boiler on
adjustable anti-
vibration feet
C
(see chapter "Clearance dimen-
sions").
Adjustable anti-vibration feet
Insert adjustable feet into the base rails from below.
Siting and levelling the boiler
5457357