Page 1: ...instructions for the system user Viesmann Boilers for woodchips and pellets With Ecotronic weather compensated digital boiler and heating circuit control unit VITOLIGNO 300 H 5679252 GB 10 2019 Please...

Page 2: ...sed or have been instructed in the safe use of this appliance as well as in any risks arising from it Please note Supervise children in the proximity of the appliance Never permit children to play wit...

Page 3: ...not tested with the heating system may damage the system or affect its function Have all installation or replacement work carried out exclusively by heating contractors Safety instructions for operat...

Page 4: ...sub stances in the boiler room or in direct proximity to the heating sys tem Please note Incorrect ambient conditions can lead to heating system damage and can put safe operation at risk Ensure ambie...

Page 5: ...heating 18 Time program 18 Setting the time program for central heating 18 Setting time phases 19 Deleting time phases 19 Restoring the time phases to the factory settings 20 Heating curve 20 Adjusti...

Page 6: ...nded menu 39 Checking temperatures 40 Checking fault messages 41 11 Shutdown Shutting down the heating system for an extended period 43 Shutdown 43 12 What to do if Rooms are too cold 44 Rooms are too...

Page 7: ...ge 58 Filling process for systems with spring core or horizontal discharge 58 Activating the silo filling function 59 15 Ordering fuel Substances 60 Non wood biomass fuels 60 Approved woodchips 60 App...

Page 8: ...Ecotronic control unit some terminology is explained This information can be found in chapter Terminology in the Appendix Intended use The appliance is only intended to be installed and operated in s...

Page 9: ...missions tests Your heating contractor must prepare the boiler for this test Notify your heating contractor approx 2 weeks prior to the next emissions test being due Ensure that suitable fuel is avail...

Page 10: ...circuits and for DHW See page 21 for the relevant heating circuits See page 27 for DHW heating Do not set the temperature inside the DHW cylinder too high See page 27 You can further save energy by ta...

Page 11: ...uide giving an explanation of the controls and information about heating circuit selection Call up the short guide as follows From anywhere in the menu Call up the Help menu point by pressing Standard...

Page 12: ...holiday program and time pro grams for example You call up the Extended menu as follows If the screensaver is active Press any key followed by From anywhere in the menu Press Other control devices If...

Page 13: ...it 1 Operating program Party mode Economy mode 22 C Set room temperature HC1 Heating circuit selection HC2 Was selected Heating circuit 2 Set room temperature HC1 20 C Change with Set room temperature...

Page 14: ...F Boiler heating output G Feed pump rate H Pellet hopper fill level Screensaver during operating phase Buffer drawing Buffer drawing Overview Buffer 53 A B 73 C 62 C 34 C E F D C Fig 7 A Operating ph...

Page 15: ...are open 5 Check that all covers on the boiler are closed 6 Switch ON the power supply e g at a separate MCB fuse or a mains isolator 7 Switch on the ON OFF switch on the control unit The home screen...

Page 16: ...is not reset it inhibits the safety equipment function and can damage the boiler Always carry out the following steps Vitoligno 300 H 50 to 60 kW A B Fig 9 1 Slide cover A on the programming unit to t...

Page 17: ...ms of a separate apartment Htg circuit selection HC2 Was selected Heating circuit 2 Heating circuit 1 HC1 Economy mode Select with Party mode Heating program Set room temp 21 C HC2 HC1 Fig 11 The heat...

Page 18: ...ly until the standard menu is dis played 2 for Heating 3 d to confirm 4 to select Heating circuit 1 HC1 Heat ing circuit 2 HC2 Heating circuit 3 HC3 or Heating circuit 4 HC4 if instal led 5 for Operat...

Page 19: ...Saturday Sunday Monday HC1 Fig 14 Press the following buttons 1 for the Extended menu 2 for Heating 3 d to confirm 4 to select Heating circuit 1 HC1 Heat ing circuit 2 HC2 Heating circuit 3 HC3 or Hea...

Page 20: ...highest value e g 1 5 Slope 1 5 Level 0 K The living space is too hot during the cold season Adjust the heating curve slope to the next lowest value e g 1 3 Slope 1 3 Level 0 K The living space is too...

Page 21: ...he level will shift the curves in parallel in a vertical direction Standard room temperature approx 20 C In the delivered condition the slope is set to 1 4 the level to 0 0 2 Outside temperature in C...

Page 22: ...ng circuit 2 HC2 Heating circuit 3 HC3 or Heating circuit 4 HC4 if instal led 5 for Operating program 6 d to confirm 7 for Standby mode 8 d to confirm The display briefly shows Standby mode Central he...

Page 23: ...of the display On appears on the right hand side of the display in the following menu Terminating Party mode Party mode ends automatically with the next change over to central heating with standard ro...

Page 24: ...conomy mode 6 d to confirm Economy mode Off appears briefly on the display Off appears on the right hand side of the display in the following menu Energy saving function Holiday program To save energy...

Page 25: ...u wish to change a set holiday program press the following keys 1 for the Extended menu 2 to select Heating 3 d to confirm 4 to select Heating circuit 1 HC1 Heat ing circuit 2 HC2 Heating circuit 3 HC...

Page 26: ...26 9 for Yes 10 d to confirm Adopted appears briefly in the dialogue line of the display Comfort and energy saving functions Energy saving function Holiday program cont 5679252...

Page 27: ...y until the standard menu is dis played 2 for DHW 3 d to confirm 4 for Operating program 5 d to confirm 6 for DHW or Standby mode 7 d to confirm Time program Setting the time program for DHW heating T...

Page 28: ...ther part of the week or weekday proceed as described in steps 8 to 15 Deleting time phases 1 Set the time for the end point to the same time that was set for the start point The display shows 2 Press...

Page 29: ...of the heating water buffer cylinder in manual mode 1 for the Extended menu 2 for Buffer 3 d to confirm 4 for Set temp man mode This menu point is only available when man ual mode is selected 5 d to...

Page 30: ...her time phases at another part of the week or weekday proceed as described in steps 8 to 15 Deleting time phases 1 Set the time for the end point to the same time that was set for the start point The...

Page 31: ...31 8 for the required value Heating curve Slope 100 C 20 10 0 10 20 30 65 C 70 C 75 C 81 C 1 5 60 C Change with Fig 27 9 d to confirm Heating water buffer cylinder Heating curve cont 5679252...

Page 32: ...is represented by a number or 9 d to confirm 10 to set the start point 11 d to confirm 12 to set the end point Note Do not set the blocking time to be longer than 10 hours Blocking times in excess of...

Page 33: ...ocked manually and not used 9 d to confirm The suction wands available for selection will be redisplayed 10 Repeat steps 6 to 9 to select the assignment of fur ther suction wands 11 repeatedly until t...

Page 34: ...o confirm 8 for Flush Reset or Reset all If Flush is selected The suction wand will be automatically blocked following purg ing 9 d to confirm The suction wands available for selection will be redispl...

Page 35: ...ightness 9 d to confirm Assigning names to heating circuits You can give heating circuits 1 2 3 and 4 HC1 HC2 HC3 and HC4 individual names The abbreviations HC1 HC2 HC3 and HC4 are retained Press the...

Page 36: ...the time and date Press the following buttons 1 for the Extended menu 2 for Settings 3 d to confirm 4 for Time Date 5 d to confirm 6 for Time or Date 7 d to confirm 8 for the required time or the req...

Page 37: ...tons 1 for the Extended menu 2 for Boiler 3 d to confirm 4 for Flue gas residual O2 5 d to confirm 6 for the required value 7 d to confirm Setting the minimum system temperature Set a value according...

Page 38: ...Yes 9 d to confirm The following settings and values of the selected parameter group are reset Set room temperature Set DHW temperature Time program for central heating Time program for DHW heating Ti...

Page 39: ...mperature Actual DHW temperature Set return temperature Actual return temperature Pump Valve Operating program Operating status Solar submenu Solar DHW Collector temperature Solar energy Solar circuit...

Page 40: ...ing buttons 1 repeatedly until the standard menu is dis played 2 for Information 3 d to confirm 4 for Outside temperature Heating or DHW The overview below shows the temperatures displayed in the Heat...

Page 41: ...k succession If a fault occurs shut the system down and make it safe Rectify the fault or contact your heating con tractor immediately When rectifying the fault no one else should be present in the da...

Page 42: ...42 2 for Fault 3 d to confirm Checks Checking fault messages cont 5679252...

Page 43: ...nded shutdown it may be necessary to reset the date and time See chapter Setting the time and date Shutdown 1 Note Only disconnect the mains plug of the boiler for maintenance and repair purposes Othe...

Page 44: ...th mixer mixer motor faulty Unhook motorised lever A Adjust mixer lever B man ually e g to 5 Notify your heating contractor Rooms are too hot Cause Remedy Control unit incorrectly set The remote contr...

Page 45: ...s not running Check the heating times If according to the times set in the control unit the pump should be running Notify your heating contractor Mixing valve faulty Notify your heating contractor The...

Page 46: ...om completely and cleaning it Your pellet storage room must be cleaned by an authorised con tractor at least every 2 years DHW cylinder if installed Standards DIN 1988 8 and EN 806 specify that main t...

Page 47: ...ntractor clean the interior of the boiler twice a year Interval Activities See page System user Heating contrac tors Every 7 days Check the fill level of the ash box and empty it if required 50 X Visu...

Page 48: ...ls are intended as a guide that can be adapted if required to the fuel quality and operat ing conditions Maintenance and cleaning work on the fuel discharge system Interval Activities See page System...

Page 49: ...must not be opened during heat ing operation Switch OFF the boiler before maintenance and cleaning work and allow the boiler to cool down Do not touch hot surfaces on or in the boiler burner flue syst...

Page 50: ...ing agents Carry out the cleaning at the specified intervals Empty ash box Danger During maintenance and cleaning work and when manipulating the ash box there is a risk of fire and burns due to hot as...

Page 51: ...fore closing the boiler the ash partition has to be opened again Hook in the spring clips on the left and right hand side of the boiler and push back as far as they will go The boiler can only be star...

Page 52: ...of the boiler 2 Pull the sliding levers on the boiler upwards Pull the ash box towards the front 3 Push the ash partition of the ash box as far as it will go 4 Empty the ash box 5 Proceed in reverse o...

Page 53: ...rfaces on or in the boiler burner flue system or pipework Wear suitable personal protective equipment Vitoligno 300 H 50 to 60 kW 1 2 Fig 41 1 Switch OFF the boiler before maintenance and cleaning wor...

Page 54: ...peat on the opposite side of the boiler 5 Proceed in reverse order to reassemble the light barrier Note The light barriers must be positioned centrally in front of the sight glass 6 Switch the boiler...

Page 55: ...lation Keep the door open while inside Entry to the storage room is only permitted under the supervision of a person standing outside the room The person entering should be protected by additional det...

Page 56: ...rding to the type of fuel feed See the following tables lists In terms of fuel feeds a distinction is made between two types of discharge charging systems Those without a spring core or horizontal dis...

Page 57: ...eating system 2 Put mole in park position Mole installation instructions 3 Fill the fuel store Extraction screw conveyor with vacuum module 1 Shut down the heating system 2 Fill the fuel store Filling...

Page 58: ...h spring core or horizontal discharge Danger Lashing movements of the leaf springs can cause serious injury even if the drive motor is not connected to the power supply Do not enter the fuel store Con...

Page 59: ...Press the following buttons 1 for the default display 2 to select the silo fill function 3 d to confirm 4 to enable the silo fill function 5 d to confirm Filling the fuel store Systems with spring co...

Page 60: ...ch foreign bodies increase the wear of system parts It is imperative that light metals are avoided as these will melt in the combustion chamber and lead to faults in the grate area Exceeding the above...

Page 61: ...ly poisonous flue gases Only use approved fuels Please note Unsuitable fuels result in damage to the system and increased emissions Burning waste or wood that has been treated with timber preser vativ...

Page 62: ...e Set the standard room temperature for periods when you are at home during the day Open flue operation The combustion air is drawn from the room where the boiler is installed Reduced heating mode For...

Page 63: ...g and to ensure the longest possible runtimes combi nation with a modulating room or heating controller is ideal In terms of energy a buffer cylinder and combination with a solar thermal system are re...

Page 64: ...47 62 E Economy mode 23 Setting 23 Terminating 24 Empty ash box 50 Energy saving 10 Energy saving function Detached house apartment building 24 Economy mode 23 Energy saving program Holiday program 24...

Page 65: ...ature reduced room temperature 9 18 Notice of completion 9 Notification of completion 9 O Open flue operation 62 Operating program DHW heating 27 Setting for central heating 18 Operating program setti...

Page 66: ...6 Time 36 Time date factory setting 10 Time phases Central heating 18 DHW heating 27 Heating water buffer cylinder 30 Time phases standard settings DHW circulation pump 28 DHW heating 28 Time program...

Page 67: ...67 5679252...

Page 68: ...find local contractors on the internet at www viessmann de Viessmann Limited Hortonwood 30 Telford Shropshire TF1 7YP GB Telephone 44 1952 675000 Fax 44 1952 675040 E mail info uk viessmann com Viess...