3
Disposal of packaging ............................................................................
Key to date of manufacture ....................................................................
Product information ................................................................................
Clearance dimensions ...........................................................................
Components in thermal insulation package ...........................................
Thermal insulation pack 1 ................................................................... 10
Thermal insulation pack 2 ................................................................... 11
Siting and levelling the boiler ................................................................. 13
Fitting the thermal insulation and casing sections ................................. 14
Thermal insulation jacket for boiler body ............................................ 14
Front thermal insulation mat ............................................................... 14
Repositioning the boiler door hinges (if required) ............................... 15
Closing the boiler door ........................................................................ 15
Top and bottom rails and side panel supports .................................... 16
Mounting the burner ............................................................................... 19
Fitting and aligning the front side panels ............................................... 20
Burner electrical connection .................................................................. 21
System power supply ......................................................................... 22
Routing connecting cables/leads ........................................................ 23
Burner connections on the gas side ...................................................... 24
Fitting further casing sections ................................................................ 25
Front panels and type plate ................................................................ 26
Control unit installation .......................................................................... 27
Connections to the control unit base ..................................................... 28
Connections on the heating water side .................................................. 29
Making the safety connections .............................................................. 29
Low water indicator (water level limiter) ............................................. 30
Connections on the flue gas side ........................................................... 30
Connecting the neutralising system .................................................... 31
Commissioning and adjustment ............................................................. 31
Index
5833527