14
Thermal insulation jacket for boiler body
Required parts:
■
Thermal insulation jacket
3
from thermal insulation
pack 1
■
6 spring hooks
1
from bag of fixing parts
eQ
from
thermal insulation pack 2
2.
1.
3
Fig. 8
Note
For room sealed operation, attach the ventilation air
pipe before fitting the thermal insulation panels.
Installation instructions for room sealed acces-
sories
Front thermal insulation mat
Required parts:
■
Front thermal insulation mat
8
from thermal insula-
tion pack 1
■
4 spring hooks
1
from bag of fixing parts
eQ
from
thermal insulation pack 2
2.
1.
8
Fig. 9
!
Please note
If the boiler door falls back this can cause dam-
age and injuries.
Prevent the boiler door from falling back after it
has been opened.
Fitting the thermal insulation and casing sections
5833527