Top and bottom rails and side panel supports
Parts required from thermal insulation pack 2:
■
Top left rail
wT
■
Top right rail
wZ
■
Bottom rails
eP
■
Screws from bag of fixing parts
eQ
■
Connectors
eW
are supplied with the boiler
5.
1.
4.
16x
16x
2.
A
wZ
eP
eW
3.
wT
Fig. 12
5.
Loosely fit the supports to the base frame, using
two M 6 x 16 screws for each.
Note
The top rails must be flush at the front (see
A
).
The base rails must protrude at the back.
Side panels
Parts required from thermal insulation pack 1:
■
Centre side panel
5
■
Back right side panel
4
■
Back left side panel
2
■
Side panel
6
Parts required from thermal insulation pack 2:
■
Centre side panel
5
■
Control unit side panel
qI
■
Screws from bag of fixing parts
eQ
Fitting the thermal insulation and casing…
(cont.)