6
For further information regarding the individual steps, see the page indicated
Commissioning steps
Inspection steps
Maintenance steps
Page
•
1. Filling the heating system
..............................................
8
•
2. Venting the boiler
...........................................................
9
•
3. Venting the heating system
...........................................
9
•
4. Filling the siphon with water
......................................... 10
•
•
•
5. Checking all connections on the heating water side
and DHW side for leaks
•
6. Checking power supply connection
•
•
7. Setting the time and date (if required)
–
only for
weather-compensated control units
............................. 11
•
8. Selecting the language (if required)
–
only for weather-
compensated control units
............................................ 12
•
•
9. Checking the gas type
.................................................... 12
•
10. Gas type conversion (only for operation with LPG)
.... 13
•
•
•
11. Function sequence and possible faults
....................... 13
•
•
•
12. Checking the static and supply pressure
..................... 15
•
13. Setting the maximum output
........................................ 17
•
14. Checking the balanced flue system for tightness
(annular gap check)
........................................................ 18
•
•
15. Removing the burner and checking the burner gasket
(replace gasket every 2 years)
...................................... 19
•
•
16. Checking the burner gauze assembly & replacing, if
required
........................................................................... 21
•
•
17. Checking and adjusting the ignition and ionisation
electrodes
........................................................................ 22
•
•
18. Cleaning the combustion chamber/heat exchanger
and installing the burner
................................................ 22
•
•
19. Checking the condensate drain and cleaning the
siphon
.............................................................................. 24
Commissioning, inspection, maintenance
Steps - commissioning, inspection and maintenance
5692 760 GB
Summary of Contents for VITOCONTROL-S, WB2B
Page 5: ...5 Keyword index 119 Index Index cont 5692 760 GB ...
Page 121: ...121 5692 760 GB ...
Page 122: ...122 5692 760 GB ...
Page 123: ...123 5692 760 GB ...