
18
Note
The output can also be limited for DHW
heating. For this, change coding address
"6F" in code 2.
Checking the balanced flue system for tightness (annular gap
check)
A
A
Combustion air port
For balanced flue systems tested
together with the wall mounted gas fired
boiler, the requirement for a tightness
test during commissioning by the flue
gas inspector is not applicable.
We recommend that your heating engi-
neer carries out a simple leak
/
tightness
test during the commissioning of your
system. For this, it would be sufficient to
check the CO
2
or O
2
concentration in the
combustion air at the annular gap of the
balanced flue pipe.
The flue pipe is deemed to be gas-tight
if the CO
2
concentration in the combus-
tion air is no higher than 0.2
%
or the
O
2
concentration is at least 20.6
%
.
If actual CO
2
values are higher or O
2
val-
ues are lower, then pressure test the flue
pipe with a static pressure of 200 Pa.
Commissioning, inspection, maintenance
Further details regarding the individual steps
(cont.)
5692 760 GB
Summary of Contents for VITOCONTROL-S, WB2B
Page 5: ...5 Keyword index 119 Index Index cont 5692 760 GB ...
Page 121: ...121 5692 760 GB ...
Page 122: ...122 5692 760 GB ...
Page 123: ...123 5692 760 GB ...