6.1   Commissioning the coldroom

 

 

-  only for the intended or agreed purpse

 
 

 

After assembly, clean and ventilate the coldroom. 

 

  (See section „Cleaning the Coldroom“). 

 

  The coldroom is ready to operate. The refrigeration unit can

 

  be activated according to the separate Operating Manual. 

 

  Allow the temperature in the coldroom to reach the  

 

  desired value. Place refrigerated goods in the coldroom  

 

  only when this value has been reached. 

 

  Have the pressure compensation valve checked by a refri 

 

  geration specialist. Do not exceed the allowed pressure 

 

  differential in the coldroom of 100 Pa (1 mbar). Check the  

 

  function of the pressure compensation valve regularly. The  

 

  opening of the valve must not be blocked internally or  

 

  externally (e.g. by refrigerated goods).

 

6.2   Permissible loads for flooring panels

 

 

Wheel load N   Wheel load N  

Wheel load

 

 

> 1 cm

2

 

> 4 cm

2

 

in N/m

2

 

 

  hard 

rubber wheel

 

 

bakery wheel

 

1. 

250 

1000 

30.000

 

6.3   Deactivation

 

 

When the coldroom is to be deactivated for a long period,

 

  the power supply plug must be disconnected or the power  

 

  supply must be switched off. Provide sufficient ventilation!

6.4   Cleaning the coldroom

 

  During cleaning the refrigeration unit and the coldroom 

 

  should be cut off from the power supply.

 

 

Remove the plug from the power supply during such

 

  work and secure against the plug being reinserted, or

 

  switch off the power supply at source and secure 

 

  against switching on.

 

 

 

  Elements with powder-coated steel plate surfaces or 

 

  stainless steel surfaces: do not spray water onto walls, 

 

  ceilings, elements with electrical components (e.g. door 

 

  frame) or the refrigeration units inside or outside. Wipe out

 

  the inside of the coldroom, dry well and allow ventilation. 

 

  Do not use scouring agents or cleaning agents containing 

 

  solvents. Wipe the outside of the coldroom with a damp 

 

  cloth. 

 

  Standard floor:

 

  Only wipe with a moist cloth Not suited for stagnant 

 

  water or jet water!

 

 

 

  Wash the door seals regularly with soapy water and wipe

 

  dry. Do not clean the seals with Aceton or 

 

  solventcontaining detergent.

 

  The walls, shelves, containers and packing materials 

 

  can be washed off with potassium sorbate solution

 

  (1 tablespoon of potassium sorbate dissolved in

 

  0.1 litre of water. Potassium sorbate is produced by

 

  Merck and available at the local chemist‘s.) Wipe the

 

  walls, shelves, etc., with a linen towel dampened by

 

  the solution. The solution should dry onto the parts 

 

  cleaned, leaving a light coat of residue.

 

  The stainless steel coldroom flooring can be treated

 

  with normal stainless steel cleaners (e.g. ETOLIT, Fa. 

 

  Viessmann). Seal the stainless steel surface with an 

 

  appropriate material for stainless steel (e.g. Chromadur, 

 

  Fa. Assindia-Chemie or Inox Top, Fa. Viessmann).

 

  Pay attention to the product information!

6.  Commissioning

Summary of Contents for TectoCell Compact 100

Page 1: ...o Any work on the electrical parts of the coldroom must be assembling or commissioning the unit Your specialist done by qualified electricians The plug must be separated refrigeration technician will...

Page 2: ...embly 3 1 Connecting the coldroom panels 3 2 Assembly of the flooring panels 3 3 Assembly of the wall panels 3 4 Assembly of the door 3 5 Assembly of the ceiling panels 3 6 Assembly of the door thresh...

Page 3: ...or installing a ceiling refrigeration unit or other elements such as hanging rails pipes etc additional support must be provided during assembly Attention During installation of the refrigeration uni...

Page 4: ...ial prop construction Before starting to install the device check the dimensions of the intended place of installation With this also the right angularity has to be checked by diagonal measurement lt...

Page 5: ...a distance of 200 to 300 mm from each other Ensure that the joins B and the exterior edges A are placed exactly on the flooring gratings lf there is unevenness in the flooring the flooring gratings mu...

Page 6: ...be done carefully to prevent any and all penetration by water or contamination The individual coldroom elements are labelled The respec tive position of each coldroom element can be ascertained by com...

Page 7: ...g panels with one or two sided connections fill the points marked on the drawing with sealant Do not place weight on the panel to be assembled Push the flooring panels together and tighten the externa...

Page 8: ...the side section of the door frame or on the wall before installing the ceiling elements During installation ensure that the evaporator fan does not blow onto the door leaf and the pressure compensat...

Page 9: ...the cap in order to release the cap locking After releasing the screw P or R the door can be adjusted horizontally or depthwise For vertical adjustment turn the screws of the rising hinges T so that t...

Page 10: ...nels which are screwed onto the floor of the room in which the coldroom is assembled These are constructed such that they form a seal with the floor of the building During assembly the wall panels are...

Page 11: ...Open the distributor s lead through opening and insert enclosed grommet Insert the power supply lead into the grommet and secure to L1 N and PE in the distributor Connect to power supply The power le...

Page 12: ...m the side of the outside handle using a 2 5 mm hexagon key L Insert key H into the cylinder F turn to the horizontal position with turn and remove cylinder lock with key Install in reverse sequence T...

Page 13: ...eaning the refrigeration unit and the coldroom should be cut off from the power supply Remove the plug from the power supply during such work and secure against the plug being reinserted or switch off...

Page 14: ...adiation from the sun will increase power use Allow warm food to cool down to room temperature before placing it the coldroom Avoid keeping the door open for longer than necessary Monitor temperature...

Page 15: ...ils of this technical documents serve for description Consents regarding the availability of certain features or regarding a certain purpose always require a special written agreement Page 15 GB Right...

Page 16: ...Middle East FZE Telephone 971 43724247 refrigeration viessmann ae www viessmann ae United Kingdom Viessmann Refrigeration Systems Limited Telephone 44 1952 457157 sales viessmann coldtech co uk www v...

Reviews:

Related manuals for TectoCell Compact 100