2.
Check the inlet pressure of the
internal (and, if installed, external)
diaphragm expansion vessel.
Note
For the position of the internal dia-
phragm expansion vessels, see
unit layouts from page 5.
3.
Thoroughly flush the system.
4.
Fill the system with process med-
ium and fully vent the system via
the fill & drain valve (for position,
see unit layouts from page 5).
Note
The equipment is fitted with two
manual air vent valves (for posi-
tion, see
A
in Fig. on page 5
and 6)
Observe the details regarding the
handling of
antifreeze
on page 20.
5.
Check the system pressure (see
page 11).
6.
Return the non-return valves (if
installed) into their operating posi-
tion.
Checking the diaphragm expansion vessel and the pressure
of the hydraulic circuit
Carry out this test on a cold system.
1.
Drain the system on the heating
water side and reduce the pressure
until the pressure gauge indicates
"0".
2.
If the inlet pressure of the dia-
phragm expansion vessel is lower
than the static system pressure,
top up with sufficient nitrogen to
raise the inlet pressure 0.2 bar
higher than the static system pres-
sure.
Further details regarding the individual steps
(cont.)
10
Commissioning, inspection, maintenance
5692
695
GB
Summary of Contents for OC208HM
Page 28: ...A Continued see page 29 Menu structure overview 28 Control settings 5692 695 GB ...
Page 45: ...45 5692 695 GB ...
Page 46: ...46 5692 695 GB ...
Page 47: ...47 5692 695 GB ...