6
Vertical DHW cylinder made from steel with Cerapro-
tect enamel coating.
With immersion heater EHE for heating with surplus
electricity and with indirect coil for reheating by the
boiler.
Inspection and maintenance
DIN 1988 requires a visual inspection and (if neces-
sary) cleaning no later than 2 years after the cylinder
has been commissioned, and thereafter according to
requirements.
Note
In addition, we recommend an annual visual inspection
of the protective magnesium anode (see page 10).
System examples
Available system examples: See
Spare parts lists
Information about spare parts can be found on the
Viessmann spare parts app.
Information
Product information
5677415
Information
Summary of Contents for CVE
Page 19: ...19 5677415 Appendix ...