7
Commissioning steps
Inspection steps
Maintenance steps
Page
•
....................................................................................................
•
•
2. Draining the DHW cylinder on the DHW side (if required)
.............................................
•
•
•
•
4. Checking the function of safety valves
•
•
5. Checking the anode earth current with an anode tester
................................................
•
6. Cleaning and descaling the inside of the DHW cylinder
................................................
•
•
7. Checking and replacing the protective magnesium anode (if required)
•
•
8. Returning the DHW cylinder to use
.................................................................................. 11
•
•
9. Checking the connections on the water side for leaks
•
•
10. Removing the cap from the immersion heater
................................................................ 12
•
11. Resetting the high limit safety cut-out
............................................................................. 12
•
12. Replacing the TR/HLSC combination device
................................................................... 12
•
13. Replacing the heating element of the immersion heater
................................................ 13
Commissioning, inspection, maintenance
Steps - commissioning, inspection and maintenance
5677415
Summary of Contents for CVE
Page 19: ...19 5677415 Appendix ...