15
Front of top panel and programming unit
3.
1.
2.
Fig. 10
0
1.
Attach the gas spring to the right or left-hand fixing
rail.
0
2.
Fit the short and long links, each with two M6
screws, to the right and left-hand fixing rails.
0
3.
Secure the crossbar to the upper rails of the boiler
using two M6 screws.
Fitting the thermal insulation and casing
(cont.)
5799212