30
Service instructions for boiler and boiler control
unit
Front panel
2. 2x
4.
3.
1. 2x
5.
Fig. 24
1.
Insert 2 location studs into the front panel and
secure.
2.
Hook in the front panel at the bottom and pivot up,
ensuring that the hole at the top is still accessible.
3.
Insert 2 screws using a slot screwdriver.
This will protect the front panel against unauthor-
ised access.
4.
Pivot the front panel closed and click it into place.
5.
Affix the product designation label to the front
panel.
Label showing installation information
Commissioning and adjustment
5799212