21
Inserting the plugs into the programming unit
A
B
C
Fig. 16
A
230 V cable
B
Data cable to the control unit
C
LAN cable to the back of the boiler
Insert the 230 V cable plugs and data cable plugs as
shown in the diagram.
Fitting the thermal insulation and casing
(cont.)
5799212