55
Commissioning steps
Inspection steps
Maintenance steps
Page
•
•
•
•
•
•
•
3. Checking the refrigerant circuit for leaks
........................................................................ 56
•
4. Filling and venting on the primary side
........................................................................... 56
•
5. Filling and venting on the secondary side
....................................................................... 57
•
•
•
6. Checking expansion vessels and primary circuit/secondary circuit pressure
•
•
•
7. Checking the electrical connections for firm seating
•
............................................................................................... 57
•
•
•
9. Checking the electronic flow switch, type IFM
................................................................ 58
•
•
•
10. Fitting the top panel and front panel (closing the heat pump)
...................................... 59
•
11. Instructing the system user
.............................................................................................. 59
Commissioning, inspection, maintenance
Steps - commissioning, inspection and maintenance
5855865
Summary of Contents for BW 352.B027
Page 83: ...83 5855865...