14
Minimum clearances
Ensure adequate clearance around the system for
maintenance, repair and dismantling.
One heat pump
850
600
Fig. 3
Cascades with 2 heat pumps
850
850
600
Fig. 4
A
Power cable entry
B
With connection set and anti-vibration expansion
joints (accessories)
C
Clearances for installation and maintenance:
≥
500 mm
D
Clearance (according to DIN 18101)
Type BW
Minimum clearance in mm
B
D
352.B027
700
800
352.B034
800
800
352.B056
800
800
352.B076
700
944
352.B097
700
944
352.B114
700
944
352.B132
1000
944
352.B156
1000
944
353.B172
1000
944
353.B198
1000
944
Note
The electronic injection valve and the compressor wir-
ing chamber are located on the right-hand side.
Anti-vibration base
The heat pump should be sited on a base prepared on
site for the purpose of optimised noise attenuation and
even weight distribution.
Note
In the case of corner installation, enlarge the base by
the minimum clearances (see chapter "Minimum clear-
ances" on page 14).
Preparing for installation
Transport and siting requirements: Heat pump
(cont.)
5855865
Installation
Summary of Contents for BW 352.B027
Page 83: ...83 5855865...