Commissioning steps
Inspection steps
Maintenance steps
Page
•
•
•
1. Opening the heat pump
..................................................................................................... 52
•
2. Writing reports
.................................................................................................................... 52
•
•
•
3. Checking the refrigerant circuit for leaks
........................................................................ 52
•
4. Filling and venting on the primary side
........................................................................... 52
•
5. Filling and venting on the secondary side
....................................................................... 53
•
•
•
6. Checking expansion vessels and the primary circuit/heating circuit pressure
........... 53
•
7. Commissioning the system
............................................................................................... 53
•
•
•
8. Checking the electronic flow switch, type IFM
................................................................ 61
•
•
•
9. Fitting the top panel and front panel (closing the heat pump)
...................................... 62
•
10. Instructing the system user
.............................................................................................. 62
Commissioning, inspection, maintenance
Steps - commissioning, inspection and maintenance