31
Commissioning steps
Inspection steps
Maintenance steps
Page
•
1. Changing the language at the control unit
...................................................................... 32
•
•
2. Setting the time and date (if required)
.............................................................................. 32
•
................................................................................................. 32
•
•
•
4. Checking all connections on the heating water side for leaks
•
•
•
•
7. Draining the heating system (if required)
........................................................................ 35
•
8. Filling the trap and neutralising system (accessories) with water
................................ 36
•
9. Venting the fuel oil filter and suction line
........................................................................ 36
•
•
•
•
11. Function sequence and possible faults
........................................................................... 37
•
•
•
•
•
•
14. Cleaning the heating surfaces
.......................................................................................... 39
•
•
•
•
17. Replacing the nozzle and checking or adjusting the ignition electrodes
•
•
•
19. Cleaning and replacing the oil pump filter (if required)
.................................................. 47
•
20. Venting the fuel oil filter and suction line
........................................................................ 47
•
•
21. Checking the gaskets and thermal insulation sections
................................................. 47
•
•
•
22. Checking the electrical connections for firm seating
•
•
23. Checking the neutralising system (accessories)
............................................................ 48
•
•
24. Checking the activated carbon filter (accessories)
........................................................ 49
•
•
•
25. Checking the expansion vessel and system pressure
•
•
26. Adjusting the standard burner settings
........................................................................... 49
•
•
27. Adjusting the oil pressure and checking the vacuum
.................................................... 50
•
•
28. Adjusting the air volume (static burner pressure)
.......................................................... 51
•
•
•
•
•
30. Checking the safety valve function
•
31. Matching the control unit to the heating system
........................................................... 52
•
32. Adjusting the heating curves
............................................................................................ 52
•
33. Connecting the control unit to WiFi
................................................................................. 54
•
34. Linking the control unit to the LON
.................................................................................. 54
•
35. Instructing the system user
.............................................................................................. 56
•
36. Calling up and resetting the "Service" display
............................................................... 56
Commissioning, inspection, maintenance
Steps - commissioning, inspection and maintenance
6136330