19
Open flue operation
Fig. 12
A
Boiler flue connection
B
Ventilation air aperture
C
Flue gas connection
D
Ventilation air connector
E
Rodent guard
Room sealed operation
Separate flue gas/ventilation air routing
Fig. 13
A
Boiler flue connection
F
Ventilation air pipe
Installation sequence
Flue gas connection
(cont.)
6136330
Installation