37
Commissioning steps
Inspection steps
Maintenance steps
Page
•
•
•
40. Checking the flue system for unrestricted flow and tightness
•
•
•
41. Checking the external LPG safety valve (if installed)
•
42. Matching the control unit to the heating system
............................................................ 59
•
43. Adjusting the heating curves
............................................................................................ 64
•
44. Connecting the control unit to the LON
........................................................................... 65
•
45. Scanning and resetting the "Service" display
................................................................. 66
•
•
•
46. Fitting the cover panel and front panels
.......................................................................... 66
•
47. Instructing the system user
.............................................................................................. 67
Commissioning, inspection, maintenance
Steps - commissioning, inspection and…
(cont.)
5773 238 GB