36
Commissioning steps
Inspection steps
Maintenance steps
Page
•
•
1. Removing the front panels
................................................................................................ 38
•
2. Checking the power supply
•
3. Filling the heating system
................................................................................................. 38
•
4. Filling the cylinder on the DHW side
................................................................................ 39
•
5. Switching on the power supply and the ON/OFF switch
•
6. Changing the language
...................................................................................................... 39
•
7. Setting the time and date
................................................................................................... 40
•
8. Note on automatic testing of the flue gas temperature sensor
..................................... 40
•
9. Venting the boiler
............................................................................................................... 41
•
10. Venting the heating system
............................................................................................... 41
•
11. Filling the siphon with water
............................................................................................. 42
•
12. Filling the solar circuit
....................................................................................................... 43
•
•
•
13. Checking all connections on the heating water side and DHW side for leaks
•
14. Naming the heating circuits
.............................................................................................. 43
•
•
15. Checking the gas type
....................................................................................................... 43
•
16. Gas type conversion (only for operation with LPG)
....................................................... 44
•
•
•
17. Checking the static pressure and supply pressure
........................................................ 44
•
•
•
18. Function sequence and possible faults
........................................................................... 46
•
19. Setting the max. heating output
........................................................................................ 47
•
•
20. Tightness test on balanced flue system (annular gap check)
....................................... 47
•
21. Removing the burner
......................................................................................................... 48
•
•
22. Checking the burner gasket and burner gauze assembly
.............................................. 49
•
23. Checking and adjusting the ignition and ionisation electrodes
.................................... 50
•
24. Cleaning the heating surfaces
.......................................................................................... 50
•
•
25. Checking the condensate drain and cleaning the siphon
.............................................. 51
•
•
26. Installing the burner
........................................................................................................... 52
•
27. Checking the neutralising system (if installed)
•
28. Checking the anode connection
....................................................................................... 53
•
29. Testing the anode earth current with an anode tester
.................................................... 53
•
30. Draining the boiler on the DHW side
................................................................................ 54
•
31. Cleaning the loading cylinder
........................................................................................... 55
•
32. Checking and replacing the magnesium anode (if required)
......................................... 55
•
33. Re-assembling and filling the loading cylinder
............................................................... 56
•
•
34. Checking the diaphragm expansion vessel and system pressure
................................ 56
•
35. Checking the pre-charge pressure and the DHW expansion vessel (if installed)
........ 57
•
•
•
36. Checking the function of the safety valves
•
•
•
37. Checking the firm seating of electrical connections
•
•
•
38. Checking all gas equipment for tightness at operating pressure
................................. 58
•
•
39. Checking the combustion quality
..................................................................................... 58
Commissioning, inspection, maintenance
Steps - commissioning, inspection and maintenance
5773 238 GB