6. OPERATION OF THE BOILER 

NOTICE! The boiler can be serviced only by adults who have read the boiler operation 

manual. 

Before firing the boiler for the first time, please check the following: 
- the heating system is filled in, 
- the air is removed from the heating system, 
- the cleaning openings of the chimney channels are closed. 

 

The inner surfaces of the boiler can dew when you fire the boiler at low output capacity 

-  when  the  temperatures  of  heat  carrier  and  burning  products  in  the  boiler  are  low  (mostly  it 
happens  in  early  autumn  or  spring  when  demand  for  heat  is  not  strong).  To  avoid  dewing,  we 
recommend you: 
 

- as fast as possible reduce difference  between temperatures of discharge and return 

heat carrier. 

maintain the temperature of return heat carrier not lower than 60°C. 

6.1. FIRING 

Please fully open the chimney valve 3 (see Picture 1), and close secondary air supply 

valve  17.  After  opening  a  bottom  door  16  and  an  inner  door  9,  place  the  chopped  dried 
firewood or wood chips on the firegrating 6 and fire them. 

NOTICE! When firing the boiler, the top door 15 must be closed

6.2. ADJUSTMENT OF DRAFT CONTROL 

 
Draft control "Honeywell" FR124 is included to the scope of supply of the boiler. Draft 

control is established in accordance with his instructions. 

The  draft  control  should  be  screwed  in  when  filling  the  heating  system  with  the  heat 

carrier (water) so that water could almost run through the tube of the draft control. Then, using a 
grind or a sealing tape, please seal the thread joint of the draft control; screw in the draft control 
into the special slot. When screwing in the draft control during filling of the system, you can for 
sure avoid an airlock in that place and improve the performance of the draft control. 

When firing the boiler for the first time, you need to adjust the draft control. 
The gap between divisions of the thermostat is 10°C. Heat the water in the boiler up to 

70°C, hook a chain 11 (see Picture 1) from the temperature controller lever 12 to the primary air 
suction  valve  8,  at  the  bottom  door.  Adjust  the  temperature  controller  lever  so  that  the  scale 
reading could match the reading of the boiler thermometer, the length of chain 11 is selected so 
that the primary air suction valve is closed. Keep in mind that the bolt, that fixes the temperature 
controller lever to the plug, should be in front, while the lever should be positioned as shown on 
Picture 1, that is, sloped forward up to the angle of ~ 30°. If all the doors are hermetically closed 
and  the  boiler  operates  at  power  no  less  than  50%,  the  further  combustion  process  is 
automatically  maintained  by  the  temperature  controller  according  to  the  preset  temperature  of 
the heat carrier. 

 

6.3. HEATING 

When

 

the fuel gets fired, please close the inner door 9 and the bottom door 16. Open the 

top door 15 and add for fuel. After heating up the boiler, close the top door. Thus, smoke in the boiler 
will form curves, and the heat carrier will take a maximum amount of heat. Open secondary air supply 
valve 17. You can monitor boiler operation according to the colour of chimney discharge smoke. The 
smoke  must  be  thin  and  light.  If  the  smoke  is  thick  and  dark,  the  secondary  air  supply  does  not 
suffice. 

 

Recommended scheme of boiler connection to the system is provided on Picture 2. 

The boiler operates efficiently at rated power, therefore, it is recommended to install an 

accumulation  tank  into  the  heating  system.  The  minimal  capacity  of  the  accumulation  tank  is 
calculated according to the formula: 

 

Where: 
 

V

Sp

- capacity of the accumulation tank, l; 

B

- burning time, hr, 

n

- rated power of the boiler, kW, 

H

- minimal heating power to heat premises, kW, 

min

 - minimal heating power of the boiler, kW. 

Capacity of the accumulation tank is approximately calculated with the assumption that a 

minimal capacity of the accumulation tank of 50 litres comes up to every kilowatt of rated power of 
the boiler. 

 

 

Picture 2 

Recommended scheme of boiler connection to the system with accumulation tank 

1.  Boiler.  2.Accumulation  tank  “Vienybe  -  AT...” 3.Water  heater. 4.  Expansion  tank.  5.Recycling 
pump.    6.Water  strainer.    7.Shutter.    8.Reverse  valve.    9.Thermostat.    10.Manometer  11.Bleed 
valve.  12.Safety  valve.  13.Three-way  mixing  valve.  14.  Temperature  controller  of  the  recycling 
pump. 15. Thermostatic cooling valve “Regulus” DBV-1. 16.Drainage. 

 
 
 
 

Summary of Contents for SIRIJUS 20

Page 1: ...Technical Datasheet installation and Operation Manual 3 SOLID FUEL BOILERS SIRIJUS 20 SIRIJUS 30 LST EN 303 5 GOST 20548 ENG Sirijus 20 30 13 05 V1 LT ...

Page 2: ...eipt purchase of the product signature Table of Contents 1 General information 4 2 Technical Data 5 3 Description of the Design 6 4 Transportation and Storage 7 5 Installation of the boiler 7 5 1 Mounting location 7 5 2 Chimney and Flue 7 5 3 Connection to the Heating System 8 5 4 Connection of the Boiler Cooling System 10 6 Operation of the Boiler 12 6 1 Firing 12 6 2 Adjustment of Draft Control ...

Page 3: ...ificate of acceptance is filled in completely and correctly 12 WARRANTY CLAIM FORM To General Director of JSC Umega I have acquired the product made by name surname or name of company your company serial No product name date of manufacture date place of purchase name and number of the purchase document I have read the product data sheet and hereby declare that the product has been installed in acc...

Page 4: ...applicable to the product from that day I have read the terms of warranty _______________________________________________________ Buyer s surname signature and date In the event of faults during installation or use of the boiler please call 370 687 95628 370 340 60532 370 340 60533 370 340 60538 If you have claims against the product quality please fill in the warranty claim form and along with a ...

Page 5: ...ose the rest of them according to environmental requirements 9 RISK ANALYSIS AND TROUBLESHOOTING Problem Cause Action Temperature of the heat carrier above the allowable level Thermostatic cooling valve has not been installed bottom door is opened automatic pressure adjustment does not operate recycling pump does not operate lost electricity Be sure to install the thermostatic cooling valve into t...

Page 6: ...he firegrating there is an ash box 7 which can be removed by opening the bottom door 16 The bottom door is fitted with a primary air suction valve 8 which is controlled by an automatic temperature controller 10 by using a lever 12 and the chain 11 The temperature controller is fitted in the right part of the boiler In front there is fitted a thermometer 13 showing a temperature of the heat carrier...

Page 7: ...r supply valve 17 Hang off the chain 11 from the primary air suction valve 8 the valve as well as the bottom door 16 must be closed Then carefully semi open the top door wait 2 3 seconds and carefully open the top door The smoke should not enter the room If the room gets smoked it means that any of the valves may be still closed or the primary air suction valve is still opened After loading a fuel...

Page 8: ...valve 8 at the bottom door Adjust the temperature controller lever so that the scale reading could match the reading of the boiler thermometer the length of chain 11 is selected so that the primary air suction valve is closed Keep in mind that the bolt that fixes the temperature controller lever to the plug should be in front while the lever should be positioned as shown on Picture 1 that is slope...

Page 9: ... close to the boiler water conduit pos 20 as possible see Picture 1 It can be mounted in a vertical or horizontal position The valve must not be mounted with a valve head downward see Picture 3 Forbidden Position Picture 3 Mounting positions of the thermostatic cooling valve Regulus DBV 1 A valve tube A see Picture 4 is connected to the cold water conduit pressure in the system should not exceed 6...

Reviews: