5.2. CHIMNEY AND FLUE 

 
When  connecting  the  boiler  to  the  chimney  with  metal  pipes,  they  should  be  made  of 

metal sheet with the thickness at least 2 mm. 

A chimney and a flue must comply with construction codes and regulations. 
A  hole  of  the  chimney,  depending  on  the  type  of  the  boiler,  must  be  no  less  than 

diameter of the flue connection, specified in the Technical Data Table (see Section 2).  

When connecting the boiler to a separate chimney, no other devices can be connected 

to it. 

The chimney draft, depending on the type of the boiler, is specified in the Technical Data 

Table (see Section 2). 

It is highly important for the chimney to be erected above the highest point of the roof. 
The  chimney  must  be  provided  with  a  cleaning  opening.  The  chimney  and  the  flue 

should be cleaned before the start of the heating season and then every 3 months. 

It  is  recommended  to  install  a  stainless  steel  liner  in  the  chimney  against  damaging 

effects of condensation moisture and exhaust gases. 

The flue, connecting the boiler to the chimney, should be as short as possible and rise in 

the  direction  of  the  chimney.  The  recommended  maximum  length  of  the  horizontal  flue  is  up  to 
1.5m. 

 

5.3. CONNECTION TO THE HEATING SYSTEM 

 
Requirements for connection to the heating system: 

The  boiler  must  be  connected  to  the  heating  system  according  the  project 

developed by heat technology specialists, either, the works may be carried out independently by a 
highly  qualified,  well-experienced plumber  -  welder,  who  has  got  well  familiarized  with  the  boiler 
design and with this description.  

The  boiler  can  be  connected  to  the  heating  system  (incl.  an  expansion  tank), 

with the operating pressure no higher than 1.5 bar. 

If the system pipes are equipped with valves that switch off the boiler from the 

heating  system,  they  should  be  fully  opened.  To  avoid  an  accident  due  to  negligence,  after 
opening the valves, please, remove their handles. 

The  system  must  be  equipped  with  a  safety  valve,  which  maintains  the 

maximum operating pressure of 1.5 bar in the heating system. 

To avoid condensation, which can shorten the life span of the boiler by several 

times,  the  heating system must  be  installed  in  such a  way  so  that  the  temperature  of  the  return 
heat carrier (water) is at least 60°C. Such a temperature of the heat carrier (water) is too high for 
heating a living space, therefore, a minor heating circuit of heating system should be installed. For 
the purpose, the system should be equipped with a three-way or four-way valve or a thermostat. 

The  system  must  be  equipped  with  a  recycling  pump,  mounted  in  the  return 

water  line  to  ensure  a  better  circulation  of  the  heat  carrier  and  a  more  even  distribution  of 
temperature  in  the  boiler.  If  the  circulation  water  pump  is  fitted  in  the  water  supply  line,  there  is 
generated a direct water flow in the boiler, whereby the water poorly distributed and mixed in the 
boiler, especially in the upper front part of the boiler. There may emerge a significant temperature 
difference  between  the  water  in  the  upper  front  part  and  at  the  outlet  of  the  boiler.  The 
temperature controller and the thermometer are mounted on the top front of the boiler, thus, when 
the recycling pump is in the wrong place, it can result in inaccurate adjustment of the air damper 
position, while the boiler will not work in the optimal mode. 

 
 
 
 

 
In order to fill the chamber1 with a fuel during combustion, open the chimney valve 3 and 

close a secondary air supply valve 17. Hang off the chain 11 from the primary air suction valve 8; 
the valve, as well as the bottom door 16 must be closed. Then, carefully semi-open the top door, 
wait 2-3 seconds, and carefully open the top door. The smoke should not enter the room. If the 
room gets smoked, it means that any of the valves may be still closed, or the primary air suction 
valve  is  still  opened.  After  loading  a  fuel  to  the  chamber,  hook  the  chain  11  to  the  primary  air 
suction  valve  8  for  the  normal  fuel  burning  monitoring  process.  Open  the  secondary  air  supply 
valves 17. 

When the burning is in progress, ashes cover the firegrating, therefore burning intensity 

decreases, and boiler output capacity drops, as well. For this reason, the fuel must be shaken and 
raked.  You  must  rake  through  the  slots  in  the  inner  door.  Take  the  ashes  away  in  time.  Strewn 
ash heap hinders primary air access to the combustion zone. 

When in use, the boiler should operate within 100-80% limits of its rated output capacity. 

To ensure such operating conditions, if there is a need, heat accumulators (accumulation tanks) 
should be employed. 

When  firing  the  wood,  you  can  load  the  chamber  fully  and  set  the  fire.  Mixed  fuel 

provides the longest duration of burning in the combustion chamber, for instance, wood, coal, and 
sawdust.  Good  results  can  be  obtained  when  burning  a  mixture  of  coal  60%  and  sawdust  40% 
(according to weight). 

NOTICE!  When  firing  coal,  only  a  half  the  chamber  can  be  stocked,  while  firing 

other kinds of fuel, you can load the chamber fully provided that the fuel does not fall off 
over the top door

NOTICE! Firing household waste in the boiler is strictly prohibited. 

In particular, all 

types of plastics waste. The boiler is not intended for that. Firing this type of waste not only sots 
the boiler and the chimney walls, but also discharges, along with the smoke, a lot of emissions to 
the environment. Save the nature - and your health! 

Try  to  use  as  a  dry  fuel  as  possible

.  This  will  improve  the  efficiency  of  the  boiler, 

increase its power output. Keep in mind that a part of the heat, generated during combustion, is 
consumed for evaporation of the water contained in the fuel; so, the more water is in the fuel, the 
more heat is consumed for it 

– and the less of it remains for space heating. 

To extend the chamber burning process, use high-calorific fuel

. Also, note that the 

chamber burning duration depends on the loaded volume of firewood, as well as on its weight. 

From time to time, if necessary, clean the boiler and the chimney

. Be sure to clean 

the boiler from soot and tar at the end of the heating season. Otherwise, water and various acids, 
accumulated in the resin, can cause damage to the walls of the boiler. 

At  the  end  of  the  heating  season,  do  not  leave  the  system  dewatered,  since  the  boiler 

will start to rust from the inside. 

 

6.4. CLEANING 

The  ash  accumulated  under  or  over  the  firegrating,  can  hinder  air  access  to  the 

combustion chamber. Therefore, before each heating, we recommend to clean the ash from the 
ash  box  and  the  firegrating.  Do  not  collect  the  ash  to  combustible  vessels  -  plastic  containers, 
cardboard  boxes,  and  so  on. We recommend  to  use  a  metal  container  for  the ash.  Do  not  pour 
out the ashes in recycle bins or other combustible places because of possible fire hazard. Wait for 
it to cool down completely. You can use the ash as fertilizer as well. 

To  ensure  the  efficient  operation  of  the  boiler,  clean  the  accumulated  ashes  and  soot 

from  inner  surfaces  of  the  boiler.  Cleaning  frequency  depends  on  the  thickness  of  the 
accumulated  ashes  and  soot  layer,  which,  in  turn,  is  subject  to  the  nature  of  the  heating.  A 
regularly used boiler should be cleaned 2-3 times a month. 

NOTICE! Do not clean the boiler during its heating. 

Summary of Contents for SIRIJUS 20

Page 1: ...Technical Datasheet installation and Operation Manual 3 SOLID FUEL BOILERS SIRIJUS 20 SIRIJUS 30 LST EN 303 5 GOST 20548 ENG Sirijus 20 30 13 05 V1 LT ...

Page 2: ...eipt purchase of the product signature Table of Contents 1 General information 4 2 Technical Data 5 3 Description of the Design 6 4 Transportation and Storage 7 5 Installation of the boiler 7 5 1 Mounting location 7 5 2 Chimney and Flue 7 5 3 Connection to the Heating System 8 5 4 Connection of the Boiler Cooling System 10 6 Operation of the Boiler 12 6 1 Firing 12 6 2 Adjustment of Draft Control ...

Page 3: ...ificate of acceptance is filled in completely and correctly 12 WARRANTY CLAIM FORM To General Director of JSC Umega I have acquired the product made by name surname or name of company your company serial No product name date of manufacture date place of purchase name and number of the purchase document I have read the product data sheet and hereby declare that the product has been installed in acc...

Page 4: ...applicable to the product from that day I have read the terms of warranty _______________________________________________________ Buyer s surname signature and date In the event of faults during installation or use of the boiler please call 370 687 95628 370 340 60532 370 340 60533 370 340 60538 If you have claims against the product quality please fill in the warranty claim form and along with a ...

Page 5: ...ose the rest of them according to environmental requirements 9 RISK ANALYSIS AND TROUBLESHOOTING Problem Cause Action Temperature of the heat carrier above the allowable level Thermostatic cooling valve has not been installed bottom door is opened automatic pressure adjustment does not operate recycling pump does not operate lost electricity Be sure to install the thermostatic cooling valve into t...

Page 6: ...he firegrating there is an ash box 7 which can be removed by opening the bottom door 16 The bottom door is fitted with a primary air suction valve 8 which is controlled by an automatic temperature controller 10 by using a lever 12 and the chain 11 The temperature controller is fitted in the right part of the boiler In front there is fitted a thermometer 13 showing a temperature of the heat carrier...

Page 7: ...r supply valve 17 Hang off the chain 11 from the primary air suction valve 8 the valve as well as the bottom door 16 must be closed Then carefully semi open the top door wait 2 3 seconds and carefully open the top door The smoke should not enter the room If the room gets smoked it means that any of the valves may be still closed or the primary air suction valve is still opened After loading a fuel...

Page 8: ...valve 8 at the bottom door Adjust the temperature controller lever so that the scale reading could match the reading of the boiler thermometer the length of chain 11 is selected so that the primary air suction valve is closed Keep in mind that the bolt that fixes the temperature controller lever to the plug should be in front while the lever should be positioned as shown on Picture 1 that is slope...

Page 9: ... close to the boiler water conduit pos 20 as possible see Picture 1 It can be mounted in a vertical or horizontal position The valve must not be mounted with a valve head downward see Picture 3 Forbidden Position Picture 3 Mounting positions of the thermostatic cooling valve Regulus DBV 1 A valve tube A see Picture 4 is connected to the cold water conduit pressure in the system should not exceed 6...

Reviews: