background image

Sirijus 20, 30 

 

 

 

 

 

 

 

 

          Sirijus 20, 30 

 

                   Sirijus 20, 30 (13.05) V1 LT           Sirijus 20, 30 (13.05) V1 LT 

6.6. REPLACEABLE PARTS DURING OPERATION 

 
Such  parts  of  the  boiler,  as  insulation  strips,  cast  iron  firegrating  can may get  burnt, 

cracked, etc. during operation.  They are available at manufacturer.  

NOTICE! Use only original spare parts of the manufacturer.

 

 

7. SAFETY  

 
During  installation  and  operation  of  the  boiler,  please,  comply  with  all  instructions 

contained in this manual. 

NOTICE!  The  boiler  can  be  fired  on  only  when  the  heating  system  is  filled  with 

liquid. 
 DO NOT: 

-  check  the  integrity  of  the  system  by  connecting  the  boiler  (tightness  of  the  boiler  is 

tested at the factory); 

- pour any flammable or metal-reactive liquid or antifreeze into the heating system. 
-  install  shut-off  fittings  (faucet,  vent,  valve)  on  the  line  between  the  boiler  and  the 

expansion tank. 

keep 

flammable 

and 

combustible 

materials 

in 

the 

room 

where 

the boiler  has been installed. 

- use flammable liquids for firing of the boiler. 

ACTIONS TO BE TAKEN

- operating pressure in the boiler must not exceed 1.5 bar. 
- preset the heating system so that the water does not get frozen. 
- once a month, check the operation of safety valves. 
- install a safety valve at a pressure of 1.5 bar into the system. 
- temperature of the water outflowing out of the b

oiler should not exceed 94°C. 

- put ash in non-combustible containers with lids. 
When  the  chamber  contains  fuel,  do  not  open  the  internal door,  as  the  bottom  layer  of 

the fuel under the gravity, can fall out from the door. 

Make  sure  that  the  primary  air  suction  valve  is  not  jammed,  that  there  is  no  foreign 

material between the shutter and its sealing surface, otherwise, an automatic combustion process 
control  will  not  work,  and  the  temperature  of  the  heat  carrier  in  the  boiler  can  rise  above  the 
allowable limit. 

Upon  any  temporary  works,  which  can  produce  flammable  gas  or  vapour  in  the  boiler 

service room, that can cause a fire or explosion, operation of the boiler must be suspended. 

NOTICE! When stirring the fuel in the burnt boiler or adding the fuel to the boiler 

chamber, flame can burst through the door. 

The boiler can be serviced only by adults who have read the boiler operation manual. Do 

not leave children by the boiler during firing without adult supervision. 

Make  sure  that  thermostat  cooling  valve  is  connected  that  does  not  allow  the  water 

temperature  in  the  boiler  to  rise  above  allowable  limits.  We  recommend  using  the  thermostat 
cooling valve “Regulus” DBV1 (Czech Republic). Please install the valve in accordance with the 
installation instructions.

 

 
 
 
 

Under the firegrating, there is an ash box 7,  which can be removed by opening the bottom 

door 16. The bottom door is fitted with a primary air suction valve 8, which is controlled by an automatic 
temperature controller 10 by using a lever 12 and the chain 11. The temperature controller is fitted in 
the right part of the boiler. In front, there is fitted a thermometer 13, showing a temperature of the heat 
carrier in the boiler.  

Fuel is loaded to the chamber through the opened top door.  
For the secondary air supply to the combustion zone, on the top door, there is a valve. The 

incoming air quantity is controlled by using the valve 17.  

For boiler cleaning, there is provided an upper opening 2. The opening of the bottom door is 

fitted  with  the  inner  door  9,  through  the  hole  of  which  you  can  see  the  combustion  process  and,  if 
needed, shake the fuel layer by using a rake, or clean firegrating gaps so that the accumulated ash did 
not prevent air to enter the combustion zone.  

At  the  rear  of  the  boiler,  there  is  a  chimney  with  a  chimney  valve  3.  A  safety  valve  14  is 

installed  next  to  a  temperature  controller  10.  A  water  discharge  outlet  21  must  be  equipped  with  a 
water faucet. 

 

4. TRANSPORTATION AND STORAGE  

 
The  boiler  can  be  transported  in  an  upright  position  by  all  types  of  transport.  During 

transportation,  is  must  be  protected  against  the  weather  -  rain,  snow.  For  the  boiler  protection 
against  turning  over  or  scratching  during  transportation,  it  must  be  securely  fastened  to  the 
vehicle. Particular caution should be given to loading and unloading works, in order to protect the 
boiler against smashing. 

The  boiler  must  be  stored  in  a  dry  place.  It  is  prohibited  to  keep  it  together  with 

chemicals that react with the metal. 

Do not store the boiler in a pile during transport and storage. 
The boiler is transported and stored by fastening it on a wooden pallet and covering with 

a plastic film, unless otherwise specified in the supply contract. 

 

5. INSTALLATION OF THE BOILER 

 
The boiler is installed in premises in accordance with requirements of RSN -159-95 and 

RPST-01-

97,  and  according  to  “Rules for  Installation  of  Solid  Fuel  Heating  Stoves  in  Buildings” 

ST 8860237.02:1998. 

Boiler  installation  process  must  comply  with  local  regulations,  including  references  to 

local and European standards. 

Boiler installation works must be carried out by a qualified and well-versed person.  
 

4.1. MOUNTING LOCATION 

 
The boiler should be erected on a non-flammable basement; the minimum distance from 

the  sides  and  rear  of  the  boiler  to  the  wall  or  the  other  partition  must  be  0.5  m;  a  minimum 
clearance from the front of the boiler must be 1.5 m; from the top to the non-combustible ceiling 

– 

at least 1m. It should be installed horizontally or sloped forward up to the angle of 1°. 

 

 
 
 
 
 

Summary of Contents for SIRIJUS 20

Page 1: ...Technical Datasheet installation and Operation Manual 3 SOLID FUEL BOILERS SIRIJUS 20 SIRIJUS 30 LST EN 303 5 GOST 20548 ENG Sirijus 20 30 13 05 V1 LT ...

Page 2: ...eipt purchase of the product signature Table of Contents 1 General information 4 2 Technical Data 5 3 Description of the Design 6 4 Transportation and Storage 7 5 Installation of the boiler 7 5 1 Mounting location 7 5 2 Chimney and Flue 7 5 3 Connection to the Heating System 8 5 4 Connection of the Boiler Cooling System 10 6 Operation of the Boiler 12 6 1 Firing 12 6 2 Adjustment of Draft Control ...

Page 3: ...ificate of acceptance is filled in completely and correctly 12 WARRANTY CLAIM FORM To General Director of JSC Umega I have acquired the product made by name surname or name of company your company serial No product name date of manufacture date place of purchase name and number of the purchase document I have read the product data sheet and hereby declare that the product has been installed in acc...

Page 4: ...applicable to the product from that day I have read the terms of warranty _______________________________________________________ Buyer s surname signature and date In the event of faults during installation or use of the boiler please call 370 687 95628 370 340 60532 370 340 60533 370 340 60538 If you have claims against the product quality please fill in the warranty claim form and along with a ...

Page 5: ...ose the rest of them according to environmental requirements 9 RISK ANALYSIS AND TROUBLESHOOTING Problem Cause Action Temperature of the heat carrier above the allowable level Thermostatic cooling valve has not been installed bottom door is opened automatic pressure adjustment does not operate recycling pump does not operate lost electricity Be sure to install the thermostatic cooling valve into t...

Page 6: ...he firegrating there is an ash box 7 which can be removed by opening the bottom door 16 The bottom door is fitted with a primary air suction valve 8 which is controlled by an automatic temperature controller 10 by using a lever 12 and the chain 11 The temperature controller is fitted in the right part of the boiler In front there is fitted a thermometer 13 showing a temperature of the heat carrier...

Page 7: ...r supply valve 17 Hang off the chain 11 from the primary air suction valve 8 the valve as well as the bottom door 16 must be closed Then carefully semi open the top door wait 2 3 seconds and carefully open the top door The smoke should not enter the room If the room gets smoked it means that any of the valves may be still closed or the primary air suction valve is still opened After loading a fuel...

Page 8: ...valve 8 at the bottom door Adjust the temperature controller lever so that the scale reading could match the reading of the boiler thermometer the length of chain 11 is selected so that the primary air suction valve is closed Keep in mind that the bolt that fixes the temperature controller lever to the plug should be in front while the lever should be positioned as shown on Picture 1 that is slope...

Page 9: ... close to the boiler water conduit pos 20 as possible see Picture 1 It can be mounted in a vertical or horizontal position The valve must not be mounted with a valve head downward see Picture 3 Forbidden Position Picture 3 Mounting positions of the thermostatic cooling valve Regulus DBV 1 A valve tube A see Picture 4 is connected to the cold water conduit pressure in the system should not exceed 6...

Reviews: