Sirijus 20, 30
Sirijus 20, 30
Sirijus 20, 30 (13.05) V1 LT Sirijus 20, 30 (13.05) V1 LT
6.6. REPLACEABLE PARTS DURING OPERATION
Such parts of the boiler, as insulation strips, cast iron firegrating can may get burnt,
cracked, etc. during operation. They are available at manufacturer.
NOTICE! Use only original spare parts of the manufacturer.
7. SAFETY
During installation and operation of the boiler, please, comply with all instructions
contained in this manual.
NOTICE! The boiler can be fired on only when the heating system is filled with
liquid.
DO NOT:
- check the integrity of the system by connecting the boiler (tightness of the boiler is
tested at the factory);
- pour any flammable or metal-reactive liquid or antifreeze into the heating system.
- install shut-off fittings (faucet, vent, valve) on the line between the boiler and the
expansion tank.
-
keep
flammable
and
combustible
materials
in
the
room
where
the boiler has been installed.
- use flammable liquids for firing of the boiler.
ACTIONS TO BE TAKEN
:
- operating pressure in the boiler must not exceed 1.5 bar.
- preset the heating system so that the water does not get frozen.
- once a month, check the operation of safety valves.
- install a safety valve at a pressure of 1.5 bar into the system.
- temperature of the water outflowing out of the b
oiler should not exceed 94°C.
- put ash in non-combustible containers with lids.
When the chamber contains fuel, do not open the internal door, as the bottom layer of
the fuel under the gravity, can fall out from the door.
Make sure that the primary air suction valve is not jammed, that there is no foreign
material between the shutter and its sealing surface, otherwise, an automatic combustion process
control will not work, and the temperature of the heat carrier in the boiler can rise above the
allowable limit.
Upon any temporary works, which can produce flammable gas or vapour in the boiler
service room, that can cause a fire or explosion, operation of the boiler must be suspended.
NOTICE! When stirring the fuel in the burnt boiler or adding the fuel to the boiler
chamber, flame can burst through the door.
The boiler can be serviced only by adults who have read the boiler operation manual. Do
not leave children by the boiler during firing without adult supervision.
Make sure that thermostat cooling valve is connected that does not allow the water
temperature in the boiler to rise above allowable limits. We recommend using the thermostat
cooling valve “Regulus” DBV1 (Czech Republic). Please install the valve in accordance with the
installation instructions.
Under the firegrating, there is an ash box 7, which can be removed by opening the bottom
door 16. The bottom door is fitted with a primary air suction valve 8, which is controlled by an automatic
temperature controller 10 by using a lever 12 and the chain 11. The temperature controller is fitted in
the right part of the boiler. In front, there is fitted a thermometer 13, showing a temperature of the heat
carrier in the boiler.
Fuel is loaded to the chamber through the opened top door.
For the secondary air supply to the combustion zone, on the top door, there is a valve. The
incoming air quantity is controlled by using the valve 17.
For boiler cleaning, there is provided an upper opening 2. The opening of the bottom door is
fitted with the inner door 9, through the hole of which you can see the combustion process and, if
needed, shake the fuel layer by using a rake, or clean firegrating gaps so that the accumulated ash did
not prevent air to enter the combustion zone.
At the rear of the boiler, there is a chimney with a chimney valve 3. A safety valve 14 is
installed next to a temperature controller 10. A water discharge outlet 21 must be equipped with a
water faucet.
4. TRANSPORTATION AND STORAGE
The boiler can be transported in an upright position by all types of transport. During
transportation, is must be protected against the weather - rain, snow. For the boiler protection
against turning over or scratching during transportation, it must be securely fastened to the
vehicle. Particular caution should be given to loading and unloading works, in order to protect the
boiler against smashing.
The boiler must be stored in a dry place. It is prohibited to keep it together with
chemicals that react with the metal.
Do not store the boiler in a pile during transport and storage.
The boiler is transported and stored by fastening it on a wooden pallet and covering with
a plastic film, unless otherwise specified in the supply contract.
5. INSTALLATION OF THE BOILER
The boiler is installed in premises in accordance with requirements of RSN -159-95 and
RPST-01-
97, and according to “Rules for Installation of Solid Fuel Heating Stoves in Buildings”
ST 8860237.02:1998.
Boiler installation process must comply with local regulations, including references to
local and European standards.
Boiler installation works must be carried out by a qualified and well-versed person.
4.1. MOUNTING LOCATION
The boiler should be erected on a non-flammable basement; the minimum distance from
the sides and rear of the boiler to the wall or the other partition must be 0.5 m; a minimum
clearance from the front of the boiler must be 1.5 m; from the top to the non-combustible ceiling
–
at least 1m. It should be installed horizontally or sloped forward up to the angle of 1°.