3. DESCRIPTION OF THE DESIGN 

NOTICE!

 

The  boiler  design  is  constantly  improved,  so  there  may  be  slight 

devia

tions from this manual. It is forbidden to modify the design of the boiler on one’s 

own

 

 

Picture 1 

 

1.Combustion  chamber.  2.  Upper  opening  for  flue  cleaning.  3.  Chimney  valve.  4.  Heat  insulation 
material. 5. Boiler finish. 6. Firegrating. 7. Ash box. 8. Primary air suction valve. 9. Inner door. 10.  
Temperature controller. 11. Chain.  12. Temperature controller lever. 13. Thermometer. 14. Safety 
valve.    15.  Top  door.  16.  Bottom  door.  17.  Secondary  air supply  valves.  18.  Base.  19. Water  inlet 
pipe.  20. Water outlet . 21. Water discharge outlet.

 

 

 
The boiler cross section is shown on Picture1. The boiler is welded from sheet steel; its 

casing  is  coated  with  heat  insulation  material  4  and  finished  5.  Firegrating  is  cast  of  alloy  cast 
iron. Boiler heat exchanger is designed so that the heat carrier, circulating in its channels, could 
as  efficiently  as  possible  assimilate  heat,  which  is  generated  during  the  combustion  process,  in 
different areas of the boiler. 

 

 

 
 
 
 
 
 

8. DISPOSAL

 

 

 
The  boiler  package  consists  of:  a  wooden  pallet,  metal  plate,  screws  and  nuts, 

polyethylene film, and the boiler. After unpacking the boiler, throw out the polyethylene film in the 
recycling  bin  (save  nature  and  sort  waste  -  polyethylene  should  be  classified  as  plastic  waste). 
The wooden pallet can be burned along with the boiler fuel. Metal plates, screws and nuts can be 
put to the ferrous scrap.  

At  the  end  of  the  of  the  boiler  service  life,  please  give  up  its  metal  parts  to  the  ferrous 

scrap, and dispose the rest of them according to environmental requirements. 

 

9. RISK ANALYSIS AND TROUBLESHOOTING 

 

Problem 

Cause 

Action 

 
Temperature 

of 

the  heat  carrier 
above 

the 

allowable level 
 

 
Thermostatic cooling valve has 
not been installed; bottom door 
is  opened  (automatic  pressure 
adjustment  does  not  operate); 
recycling 

pump 

does 

not 

operate (lost electricity) 
 

 
Be sure to install the thermostatic cooling 
valve into the system; close the door and 
dampers,  upon  drop  of  the  temperature 
to an acceptable level - keep heating; the 
boiler  may  be  extinguished  with  sand, 
earth,  or  other  non-combustible  material; 
do  not  pour  water  into  the  chamber  - 
there is a high risk of burns 
 

 
Condensation 
 

Required temperature of return 
water  is  not  provided  (>60°C). 
No  minor  circuit  has  been 
installed  in  the  system.  Wet 
fuel 
 

Install the minor circuit 

– it helps to 

fire the boiler to the required  temperature 
and  reduce  the  condensation  possibility 
much  faster.  Use  as  much  dry  fuel 

–  as 

possible. 

Wetness 

≤25% 

is 

recommended 
 

The boiler is not 
heated to the 
required 
temperature 

The boiler is decaying; 
Too much of the heat escapes 
through the chimney 

By  using  the  draft  control  manual,  adjust 
the    draft  control  so  that  the  automatic 
combustion  process  could  be  regularly 
controlled. 
 

 

6.5. FUEL 

 
NOTICE! It is forbidden to fire fuel other than the recommended one

The  boiler  is  designed  to  fire  firewood,  wooden  and  peat  briquettes,  and  coal.  Timber, 

intended for the firewood, is to be cut and split. Wetness of the fired firewood should not exceed 
20%. Firewood acquires such level of wetness during storage on a ventilated attic for 1-2 years. 
Briquettes must be kept dry, otherwise they may fall apart. Firing of wet fuel reduces power output 
of  the  boiler  and  increases  fuel  consumption,  the  boiler  gets  pitched,  corrosion  of  the  chamber 
gets faster. 
 

 
 
 

Dimensions, mm 

 

Model 

Summary of Contents for SIRIJUS 20

Page 1: ...Technical Datasheet installation and Operation Manual 3 SOLID FUEL BOILERS SIRIJUS 20 SIRIJUS 30 LST EN 303 5 GOST 20548 ENG Sirijus 20 30 13 05 V1 LT ...

Page 2: ...eipt purchase of the product signature Table of Contents 1 General information 4 2 Technical Data 5 3 Description of the Design 6 4 Transportation and Storage 7 5 Installation of the boiler 7 5 1 Mounting location 7 5 2 Chimney and Flue 7 5 3 Connection to the Heating System 8 5 4 Connection of the Boiler Cooling System 10 6 Operation of the Boiler 12 6 1 Firing 12 6 2 Adjustment of Draft Control ...

Page 3: ...ificate of acceptance is filled in completely and correctly 12 WARRANTY CLAIM FORM To General Director of JSC Umega I have acquired the product made by name surname or name of company your company serial No product name date of manufacture date place of purchase name and number of the purchase document I have read the product data sheet and hereby declare that the product has been installed in acc...

Page 4: ...applicable to the product from that day I have read the terms of warranty _______________________________________________________ Buyer s surname signature and date In the event of faults during installation or use of the boiler please call 370 687 95628 370 340 60532 370 340 60533 370 340 60538 If you have claims against the product quality please fill in the warranty claim form and along with a ...

Page 5: ...ose the rest of them according to environmental requirements 9 RISK ANALYSIS AND TROUBLESHOOTING Problem Cause Action Temperature of the heat carrier above the allowable level Thermostatic cooling valve has not been installed bottom door is opened automatic pressure adjustment does not operate recycling pump does not operate lost electricity Be sure to install the thermostatic cooling valve into t...

Page 6: ...he firegrating there is an ash box 7 which can be removed by opening the bottom door 16 The bottom door is fitted with a primary air suction valve 8 which is controlled by an automatic temperature controller 10 by using a lever 12 and the chain 11 The temperature controller is fitted in the right part of the boiler In front there is fitted a thermometer 13 showing a temperature of the heat carrier...

Page 7: ...r supply valve 17 Hang off the chain 11 from the primary air suction valve 8 the valve as well as the bottom door 16 must be closed Then carefully semi open the top door wait 2 3 seconds and carefully open the top door The smoke should not enter the room If the room gets smoked it means that any of the valves may be still closed or the primary air suction valve is still opened After loading a fuel...

Page 8: ...valve 8 at the bottom door Adjust the temperature controller lever so that the scale reading could match the reading of the boiler thermometer the length of chain 11 is selected so that the primary air suction valve is closed Keep in mind that the bolt that fixes the temperature controller lever to the plug should be in front while the lever should be positioned as shown on Picture 1 that is slope...

Page 9: ... close to the boiler water conduit pos 20 as possible see Picture 1 It can be mounted in a vertical or horizontal position The valve must not be mounted with a valve head downward see Picture 3 Forbidden Position Picture 3 Mounting positions of the thermostatic cooling valve Regulus DBV 1 A valve tube A see Picture 4 is connected to the cold water conduit pressure in the system should not exceed 6...

Reviews: