Requirements:
n
The revision shaft is shortened in such a way that it is flush with the
surface.
n
Mechanism has been removed.
Close corner valve.
Loosen flexible hose on the filling valve (SW 19).
Open the corner valve for a few seconds to rinse the pipe.
Re-close corner valve.
Flush pipelines (cistern 2H)
Handling
Flush plate Visign for Style 10
11 from 20