3 Handling
3.1
Assembly information
3.1.1
Required material and tools
The following tools are required for mounting:
n
flat screwdriver
n
knife (cutter)
3.2
Assembly
3.2.1
Prepare cistern
The following work stages and diagrams differ depending
on the cistern being used. The relevant steps are marked
accordingly.
Requirements:
n
The cistern is fitted into the front wall.
n
The front wall is tiled.
Cut into shaft cover.
Remove shaft cover.
Tool
Handling
Flush plate Visign for Style 10
8 from 20