Check  and  verify  the  correct  installation  of  the  components  in  the  system  and  also  is  the  system 

equipped  with  appropriate  expansion  tank  to  ensure  safe  work.  The  presence  of  heat  expansion  tank  in  the 
stove itself, does not guarantee adequate protection from overheating the water. 

-

 

Connect the electric supply and make a cold test (performed by the dealer)  

-

 

Fill up the system form the filling tap (recommended not to exceed 1 bar pressure.) 

During filling up the system, bleed the circulation pump.  

 

Warning ! 

During  first  start  up  purge  the  system  using  valve  at  the  top  of  the  stove.  This  operation  must  be 

performed again in the first days of use and when the system is topped up. The presence of air in the system of 
pipes could result improper work of the appliance. For easier work, there is a plastic tube available to the valve. 

The  stove  is  painted  with  heat  resistant  paint.  The  paint  is  resistant  to  high  temperatures,  but  it  is  not 

resistant to rust. Please do not  place  any objects on the stoves  paint.  If there is a dust,  the cleaning must  be 
done with smooth brush. Never use water or cloth! 

During the first ignition it is necessary to “bake” the paint to harden it. This must be done with very slightly 

opened door. During this procedure, do not put anything on the stove and do not touch the external parts to 
avoid damaging the paint. There will be slight smell, which is a result from the paint hardening. This is normal 
and will disappear in few hours. Please unsure good ventilation in the room during this procedure.  

If in a result of overheating or not proper use the color is changed, there are spots of rust or there is damage on 
the paint, do not worry. You can order the proper spray paint to your dealer. 
Before igniting please check:  
The  installation  is  correct.  Check  the  electric  supply;  the  door  is  closed  with  proper  seal;  the  combustion 
chamber is clean; the display is on stand-by (time and date set)  
 

12.Instructions for use: 

Feeling the feed screw: 
When the tank for pellets is completely empty this means that the feed screw is also empty. Before re-igniting 
the stove you must fill it up following the next steps: press b/- simultaneously (by the control panel) for 
a  few  seconds.  After  the  keys  are  released  in  few  seconds  “Reload”  will  appear.  It  is  normal  some  pellets  to 
remain  in  the  hopper,  because  the  screw wasn’t  able  to  pick  them  up.  Once  a  month  vacuum  the  hopper  to 
prevent clogging from dust.  
During the first start up of the stove (or after reloading pellets when completely emptied) it is possible the start 
up procedure to be repeated.  
Automatic ignition: 
When the stove is on stand-by position, press button 0/1 for 2 seconds (via remote control or control panel). 
This will trigger the ignition process. “Start” will appear on the display and countdown will be started in seconds 
(1020).  There  is  no  time  to  adjust  the  ignition  process:  the  duration  will  be  automatically  shortened  if  the 
control board detects that certain test are performed previously. The flame will appear in 5 minutes 

 

Manual ignition (in case of start-up failure) 
If the  temperature is lower than 3  ˚С  it  is too low  for the  igniter to heat  up  enough to start  the  fire or if the 
resistance is temporary not working, you can use a firelighter to ignite the stove.  
Place the  firelighter in the combustion chamber, close  the door and pres 0/1 on the control panel (or on the 
remote). 

 

13.Operating modes: 

 

Working with the control panel, when the stove is working or in stand-by position.  
-

 

press: + or – button, to increase or decrease the desired temperature of the water. 

-

 

With pressing the “boiler” button you can change and set the desired temperature in the boiler or with 

+/-  to  change  the  temperature  of  the  secondary  circuit.  It  is  possible  to  see  (if  the  boiler  is  connected)  the 
temperature of the boiler or external storage by pressing the boiler button and the previously set temperature 
will  be  displayed.  By  pressing  +/-  you  can  change  the  parameter.  If  the  boiler  sensor  is  not  connected  the 
following will appear on the display. “--.- ˚С”. 

 

Shutdown: 

Summary of Contents for Vittoria B Series

Page 1: ...1 Instruction for installation and operation of pellet burning stove with integral water boiler VITTORIA...

Page 2: ...nciple of operation 7 7 Operation 8 8 Safety and detection devices 8 9 Components 8 10 Installation 9 11 Basic instructions for use 11 12 Instructions for use 12 13 Operating modes 12 14 Maintenance 1...

Page 3: ...can be damaged if it is ignited or used with no water in the system The stove is designed to heat water by means of automatic combustion of pellets wood with 6 mm diameter in the combustion chamber If...

Page 4: ...tly and safely The stove must be kept in a room where the temperature is above 0 C Use appropriate anti freeze additives for the water of the system Ensure that the temperature of the return water is...

Page 5: ...s are calculated on the basis of pellets with an heating value of at least 4300 kcal kg and heating loss of the roomof 33 Kcal m h It is also important to consider the position of the stove in the roo...

Page 6: ...has to be reset manually Tank safety thermostat Switches off when the temperature in the stove is too high It stops pellet loading which is causing the stove to shut down It has to be reset manually...

Page 7: ...ing the tank is thru the back of the lid at the rear of the top The fuel pellets is taken from the tank A and via an Archimedes screw powered by electric gear motor is transported to the combustion ch...

Page 8: ...mocouple It is located at the smoke exhaust to measure the temperature It is also controlling the ignition and if the temperature is too high or too low it triggers shut down sequence Stop Flame Hoppe...

Page 9: ...ations in the voltage above 10 can cause malfunction in the appliance unless the appropriate differential switch is installed The electrical system should be in accordance with all local regulations a...

Page 10: ...d into a chimney flue a vertical section of at least 1 5 m will be required complete with a wind guard The vertical duct can be internal or external If the smoke channel is outside it must be insulate...

Page 11: ...ring the filling bleed the pump manually and open the manual vent Picture 3 These actions must be carried subsequently periodically 11 Basic instructions for use Command board Picture 5 1 Button turn...

Page 12: ...date set 12 Instructions for use Feeling the feed screw When the tank for pellets is completely empty this means that the feed screw is also empty Before re igniting the stove you must fill it up fol...

Page 13: ...on the display if is pressed No Prog Prog No 1 one ignition and shutdown per day Prog No2 same as before Prog No3 same as before Use the button to show them in reverse order If you choose the first pr...

Page 14: ...not performed and at least once a season don t make a complete cleaning could cause to poor functionality Any problems resulting from lack of maintenance will immediately void the warranty Daily maint...

Page 15: ...own If the procedures for maintenance are not performed regularly the warranty will void If the stove is used very often it is recommended to clean the smoke channel once every 3 months Warning After...

Page 16: ...rift 8 H2O TEMPALARM Shuts down due to water temperature being higher than 90 C An excessive temperature may occur because of the following system too small ask the DEALER to activate the ECO function...

Page 17: ...stove produce hot air NO Most of the heat is transferred by the water Only small part of the heat is transferred to the room whre the stove is installed by means of radiant heat from the glass It is r...

Page 18: ...18...

Page 19: ...19...

Page 20: ...not kept damages caused during transport inappropriate made heating calculations and project for heating system and installation of the stove there have been made changes in the construction of the st...

Page 21: ...21 Victoria 05 Ltd 61A Anton Strashimirov Str 5100 Gorna Oryahovitsa Bulgaria phone 359 618 60282 fax 359 618 60200 e mail info v05 bg...

Reviews: