background image

Victoria-05 Ltd.

 

 

 

 

CONTENTS 

 

 

1. INTRODUCTION....................................................................................................................................................................... 3

 

2. SAFETY INFORMATION............................................................................................................................................................ 3

 

3. TECHNICAL DATA AND DIMENSIONS....................................................................................................................................... 4

 

4. SAFETY DEVICES. ..................................................................................................................................................................... 5

 

5. CONTROL UNIT. ...................................................................................................................................................................... 6

 

6. COMPONENTS. ....................................................................................................................................................................... 6

 

7. OPERATING MODE. ................................................................................................................................................................. 6

 

8. FUEL. ....................................................................................................................................................................................... 7

 

9. APPLIANCE INSTALLATION. ..................................................................................................................................................... 8

 

10. APPLIANCE OPERATION. ....................................................................................................................................................... 9

 

10.1.

 

I

NITIAL IGNITION

. ................................................................................................................................................................. 9

 

10.2.C

ONTROL PANEL DESCRIPTION

. ................................................................................................................................................ 9

 

10.2.1.

 

M

AIN USER CONTROL PANEL

. ..............................................................................................................................................10

 

10.2.2.

 

T

YPES OF MODES OF THE CONTROL UNIT

. ...............................................................................................................................10

 

10.2.3.

 

M

AIN MENU

. ..................................................................................................................................................................11

 

10.2.4.

  

I

NSTALLER SETTINGS

. ........................................................................................................................................................12

 

10.2.5.

 

S

ERVICE TECHNICIAN SETTINGS

. ...........................................................................................................................................13

 

10.3.

 

C

OLD TEST

. .......................................................................................................................................................................14

 

11. INSTRUCTION MANUAL. ......................................................................................................................................................14

 

11.1.

 

W

OOD PELLETS LOADING

. .....................................................................................................................................................14

 

11.2.

 

W

OOD PELLET REFUELING

. ....................................................................................................................................................14

 

11.3.

 

S

TARTING UP THE SYSTEM

. ....................................................................................................................................................14

 

12. MAINTENANCE. ...................................................................................................................................................................15

 

12.1.

 

D

AILY CLEANING

. ................................................................................................................................................................15

 

12.2.

 

W

EEKLY CLEANING

. .............................................................................................................................................................15

 

12.3.

 

C

LEANING ASH FROM THE FLUE CHANNELS

. ................................................................................................................................15

 

12.4.

 

S

EASONAL MAINTENANCE 

(

PERFORMED BY THE INSTALLER

)............................................................................................................15

 

12.5.

 

M

AINTENANCE AND CONTROL

. ...............................................................................................................................................16

 

15. FREQUENTLY ASKED QUESTIONS. ........................................................................................................................................17

 

16. TECHNICAL DOCUMENTS. ....................................................................................................................................................18

 

SPARE PARTS CATALOGUE .........................................................................................................................................................24

 

WARRANTY CONDITIONS...........................................................................................................................................................25

 

DIARY ........................................................................................................................................................................................26

 

 

 

 

Summary of Contents for VITTORIA 10

Page 1: ...INSTRUCTION MANUAL for installation and operation of air pellet stove VITTORIA 8 VITTORIA 10...

Page 2: ...E CONTROL UNIT 10 10 2 3 MAIN MENU 11 10 2 4 INSTALLER SETTINGS 12 10 2 5 SERVICE TECHNICIAN SETTINGS 13 10 3 COLD TEST 14 11 INSTRUCTION MANUAL 14 11 1 WOOD PELLETS LOADING 14 11 2 WOOD PELLET REFUEL...

Page 3: ...of failure of any of its components Safety components are activated without outside interference Necessary for the proper operating of the pellet stove is its proper installation in accordance with t...

Page 4: ...Victoria 05 Ltd 4 3 Technical data and dimensions Drawing 1...

Page 5: ...pellets with calorific value not less than 4300 ccal kg and heat loss of heated room 33 ccal m h Consideration must be given to the availability of external devices that can influence the operation o...

Page 6: ...outlet and intakes combustion air by vacuum Gear motor Driven auger screw by means of which the pellets are conveyed from the pellet fuel hopper to the combustion chamber Room air fan Ensures additio...

Page 7: ...from Picture 2 Through the control panel the user can visualize and manage all stages of the operation of the pellet stove 8 Fuel Pellet stove e designed and programmed to burn wood pellets They have...

Page 8: ...o the timber wall or other inflammable material suitable materials such as ceramic wool should be used to isolate it Fresh air opening Imperative to ensure submission of fresh air The room in which is...

Page 9: ...after installation to make a detailed instruction of the user Pellet stove is coated by high temperature resistant paint but not against corrosion In case of accumulation of dust surfaces can be clean...

Page 10: ...appear after the process has been finished If for more than 6 seconds there is no connection to the Control Unit the value will not be saved Day time and night time temperatures To change the require...

Page 11: ...h Intermediate clean indicates the time left before the system starts cleaning mode Recommended value 600 Pellets indicates the volume of the pellets used during operation mode Input value is gr min D...

Page 12: ...have to be touched to unlock the display 10 2 4 Installer settings Types of settings for Installer entered with installer password Factory settings Vittoria 8 Vittoria 10 Duration 700 sec 700 sec Fan...

Page 13: ...s how often the cleaning procedure has to be triggered The set value is summed up from the feed screw working time By this way it s possible to set the cleaning based on the calculation of the amount...

Page 14: ...me runs out the mode is changed to feeding loading In this mode again a time counter is shown The default time is 70 sec The smoke fan is reducing the power The screw is activated and starts loading i...

Page 15: ...ny scales that clog the holes Picture 6 Vacuum clean the combustion chamber and all contact edges Clean the glass when it is cold If necessary use appropriate detergent Never vacuum hot coals because...

Page 16: ...as stopped working Error messages are described below Do not unplug the pellet stove from the main electrical supply during shutdown process In case of failure To restart the pellet stove is necessary...

Page 17: ...pipes and combustion chamber are clean Flue outlet pipes are clean 15 Frequently Asked Questions The following answers are tentative For more details use the instruction manual What is need to prepare...

Page 18: ...f the pellet stove has not worked for a long time Can you use other types of fuel than wood pellets NO Pellet stove is designed to work with wood pellets with a diameter of 6 mm The use of another typ...

Page 19: ...12 2018 INSTRUCTION MANUAL for installation and operation of pellet stove VITTORIA 8 VITTORIA 10 19...

Page 20: ...Victoria 05 Ltd 20...

Page 21: ...12 2018 INSTRUCTION MANUAL for installation and operation of pellet stove VITTORIA 8 VITTORIA 10 21...

Page 22: ...Victoria 05 Ltd 22...

Page 23: ...12 2018 INSTRUCTION MANUAL for installation and operation of pellet stove VITTORIA 8 VITTORIA 10 23...

Page 24: ...ass sealing set 11 Combustion chamber set 12 Fire grate 13 Deflector top 14 Handle 15 Fire door set 16 Ashtray 17 Grill for hopper 18 Left side plate set 19 Right side plate set 20 Special tool 21 Dis...

Page 25: ...the remaining population For other countries please contact you dealer Any warranty repair of the pellet stove is recorded in the diary of warranty Warranty of the pellet stove is NOT VALID in the fol...

Page 26: ...Victoria 05 Ltd 26 DIARY for repairs under warranty Company Receipt date Type of repair Delivery date Carried out...

Page 27: ...12 2018 INSTRUCTION MANUAL for installation and operation of pellet stove VITTORIA 8 VITTORIA 10 27...

Page 28: ...Victoria 05 Ltd 1B Ivan Momchilov Str 5100 Gorna Oryahovitsa Republic of Bulgaria phone 359 618 60282 fax 359 618 60200 e mail info v05 bg http www v05 bg...

Reviews: