TOOL SETUP
RG1210 tools can be used to groove pipe that
is supported by several different methods . Refer
to the setup instructions listed in this section for
different grooving options .
A hoist eye has been provided to allow the use
of a lifting device when mounting the tool .
PIPE VISE SETUP
1.
When grooving pipe that is supported with a
pipe vise, select a location for the tool and pipe
vise by taking into consideration the following
factors:
a.
Adequate space to handle pipe lengths
b.
A firm and level surface for the pipe vise
c.
Anchoring requirements for the pipe vise
2.
Mount a pipe vise onto a stand or work
bench . The pipe vise should be mounted flush
with, or slightly overhanging, the edge of the
stand or work bench . When the tool is mounted
on the pipe, the tool must be able to rotate
freely around the pipe without being obstructed
by the stand or work bench .
3.
Secure a length of pipe in the pipe vise .
Pipe position and pipe vise anchoring must be
capable of supporting the weight of the tool
(95 .5 pounds/43 .3 kilograms), the weight of the
pipe, and the force generated during operation
of the tool .
Position the pipe to overhang the pipe vise by a
minimum of 5 inches/127 mm, so that the tool
can rotate freely . Depending on the stand being
used, additional clearance may be needed .
4.
Mount the tool on the pipe, then turn the
depth feed nut clockwise to lower the upper roll
until the tool rests snugly on the pipe . Move the
groove diameter adjustment nuts to the top of
the threaded rod so as not to interfere with the
setup groove .
GROOVE-IN-PLACE SETUP
DANGER
• Depressurize and drain
the piping system before
attempting to adjust or
disassemble any Victaulic
piping products.
• Pipe hangers must be capable of handling
the weight of the tool and the manual
effort required to operate the tool.
Failure to follow these instructions could
result in serious personal injury and/or
property damage.
Previously installed pipe may be grooved
with a RG1210 tool, provided that the pipe
is supported securely and that the system is
completely depressurized and drained . Pipe
hangers must be capable of supporting the
weight of the tool (95 .5 pounds/43 .3 kilograms),
the weight of the pipe, and the force generated
during operation of the tool .
1.
Ensure that there is adequate clearance
around the pipe to permit proper tool rotation
during the grooving process . Refer to the “Tool
Dimensions and Specifications” section .
10
REV_A
TM-RG1210
/ Operating and Maintenance Instructions Manual
Summary of Contents for RG1210
Page 2: ......
Page 22: ...This page intentionally blank ...