
Crate packaging
27
Fitting the control
segment
The control segment regulates the interval between the times at which
the front and rear rotors are raised. The control segment is fitted to the
front lift arm.
Place the sealing ring (2) onto the flange piece.
Place the washers (4) onto the bolts (5).
Fasten the control segment (1) and spacer with bolts (5).
Adjusting the control
segment
Slightly loosen the bolts (5) and move the position of the control
segment (1) in the elongated hole in order to change the interval
between the times at which the front and rear rotors will be raised.
Tighten the bolts (5) in the desired position.
Moving the control segment clockwise shortens the time between the
points when the front and rear rotors are raised.
No.
Quantity
Part
1
1
Control segment
2
1
Sealing ring
3
1
Spacer with lubricating nipple
4
2
M10 washers
5
2
M10 x 80 Allen bolts
1
2
3
4
5