88
MPOLx-84/85 (P)
10 W
ORKFLOW
MODE
I
F
A
TEST
HAS
FAILED
/
REPEATING
A
TEST
NOTE:
A test can be run several times and saved again. If already
reported the new results will substitute the previous results in the
mobile and cloud app, but not be deleted in the instrument data
storage.
Viewing the test progress
The progress of a project is displayed in several ways:
If a test has failed / repeating a test
When running a workflow project you usually aim to pass all
tests. If a test failed or even if a passed test does not show the
expected results you can restart the test (e.g. after you have
improved the device under test.
To restart a test:
1.
Simply tap again the test in the active label.
The test is run again.
2.
Save the results if the test meets your requirements.
The results are stored in the instrument and the storage ID of
the test type is incremented. Already safed results will not be
overwritten. After synchronisation with the Mobile and Cloud
App the results will be refreshed accordingly.
While test is running
In the test screen:
by the PASS or FAIL message
In the label list:
(1)
: Graphical bar showing overall
progress of test (full bar = 100%,
green = pass, red = fail)
(2)
: Progress of label
(3)
: Progress of test in selected
label
1
2
3