MPOLx-84/85 (P)
59
6 L
OSS
/L
ENGTH
T
EST
O
PERATION
R
EFERENCING
AND
RUNNING
A
TEST
WITH
24
FIBER
CABLING
The connection icon (1) shows if source and power meter are
linked properly.
4.
To start the test tap the start button (2)
– or –
Press the
[
A
]
key and tap the
[
Auto Test
]
button.
The display informs about the progress.
5.
“Viewing test results” on page 60
.
1
2