10 

Instructions for product liquidation after its operating life 

 
VIADRUS a.s. is contractual partner of firm EKO – KOM a.s. with client number F00120649.  
The packages comply with 

Č

SN EN 13427. 

With  respect  to  the  fact  that  the  product  is  designed  out  of  common  materials  the  individual  parts  are  recommended  to  be  liquidated  in  the 
following manner: 

-

 

exchanger (grey cast iron), by a company engaged in salvage and liquidation of waste 

-

 

tube distributions, jacketing, by a company engaged in salvage and liquidation of waste 

-

 

other metal parts, by a company engaged in salvage and liquidation of waste 

-

 

sealing materials in common waste 

 

We recommend to dispose the packages in the following way: 

plastic foil, cardboard cover, use a salvage point  

metal strapping tape, use a salvage point  

wooden  base,  is  designated  for  a  single  usage  and  no  longer  can  be  used  as  a  product. Its  disposal  is subject  to  Act.  477/2001  Sb. a 
185/2001 Coll.as amended.  

 

In  case  that  the  product  has  lost  its  manufacture  qualities  there  can  be  taken  the  advantage  of  product  taking  back  (if  this  is 
established), in case that the originator has declared that this is a waste and it must be handled according to the valid legislation of 
the relevant country.   

 
 

11 

Warranty and defect liability 

  
VIADRUS  a.s. provides  the  basic  guarantee  period  during  24 months  from  the  sell-by  date,  but  not longer  than  30 months  from  the 
dispatch date of the product from the production plant. 

The condition for validity of the guarantee is observation of instructions for mounting, mainly as following: 

 

Connection according to the schemes of the manufacturer by a qualified supply or mounting company with a valid mounting certificate. 

 

Commissioning the product by a service company with a valid service certificate. 

 

Observation of instructions specified in the Service and Installation Manual for the boiler. 

 

Performance of regular inspections given by the manufacturer by a service company with a valid service certificate. 

 

Evidencing all records about fulfilled guarantee and after-guarantee repairs and about performance of regular annual checks of the boiler 
in the amendment to the guarantee card of this manual. 

 

Usage of original spare parts supplied by the manufacturer. 

 

Sending  information  to the manufacturer  about  commissioning  the boiler  (this  information  is to  be  sent  by  the  end  user  –  a  consumer). 
Mainly, it is necessary to specify when and by whom the boiler was commissioned, as well as it is necessary to specify a precise address 
of operation of the boiler. 

 
VIADRUS a.s. provides the extended guarantee period for the boiler drum during 60 months from the sell-by date, but not longer than 
66 months from the dispatch date of the product from the production plant. 

The condition for recognition of the extended guarantee period is the following: 

 

Observation of the conditions for recognition of the basic guarantee period. 

 

Sending information to the manufacturer about commissioning the boiler (this information is to be sent by a service company) 

 

Fulfilment  of  regular  service  inspections  within  the  range  prescribed  by  the  manufacturer,  by  a  service  company  with  a  valid  service 
certificate. 

In  case  of  a  claim  of  the  boiler  shell,  a  customer  is  obliged  to  present  the  packaging  label  of  the  boiler  shell.  It  is  placed  on  the 
cardboard box, in which the boiler shell is transported.  

The  user  is  obliged  to  order  removing  defects  only  to  a  qualified  contractual  service  organization  accredited  by  the  boiler 
manufacturer – VIADRUS a.s., otherwise the guarantee for appropriate function of the boiler would not be valid. “Certificate of quality 
and completeness of the boiler” serves – after its fulfilment – as a “Guarantee certificate”. 

The user is obliged to perform regular maintenance of the boiler. 

Each notification of defects has to be made immediately after their detection and always in written form and by phone. 

In case of non-observance of the above mentioned instructions, the guarantee provided by the manufacturer is not admitted. 

The manufacturer reserves the right for changes performed within innovation of the product, which don’t need to be included to this 
manual. 

The manufacturer is not liable for possible damages, if the product is not operated in accordance with the conditions specified in this 
Service manual. 
 
The grant does not apply for: 

-

 

faults  caused  by  improper  assembly  and  improper  attendance  of  the  product  and  faults  caused  by  improper  maintenance  see 
chap. 8; 

-

 

faults and damage caused by failure to observe water quality  in heating system see chap. no. 4.1 and 5.3 or by using the anti-
freeze mixture; 

-

 

faults caused by failure to observe instructions stated in this manual;  

-

 

defects caused by a wrong assembly or incorrect operation of the product; 

-

 

damage of the product during transfer or other mechanical damage; 

-

 

the faults caused by natural disasters or force majeure; 

-

 

defects caused by improper storage. 

 

Summary of Contents for U 22 D

Page 1: ...VIADRUS U 22 C D Manual for boiler operation and installation GB_2015_24 GB_2017_14 ...

Page 2: ...Boiler drum installation 10 5 3 2 Jacket assembly 10 5 3 3 Filling of the heat system with water 11 6 Putting into operation instructions for a contractual service organization 12 6 1 Control operation before starting 12 6 2 Putting the boiler into operation 12 6 3 Boiler transformation from solid fuels to gas and liquid fuels and retroactively 12 7 User s boiler service 12 7 1 Heating up 13 7 2 O...

Page 3: ... cast iron exchanger and all other parts with respect to the quality of used materials 2 Design approved in the long term 3 Elaborate production technology on automatic forming lines with consistent and approved quality of the production process ISO 9001 ISO 14 001 4 Efficiency of coke and anthracite burning 75 80 efficiency of wood burning 75 5 Simple service and maintenance 6 Low demandingness f...

Page 4: ...tuated at the back part of the boiler The back section of the boiler has a smoky chimney pot and a heat water flange in the upper part and a returnable water flange with a socket for impregnating and clearing plug Stoker and ash door and a firebox door under them are fixed to the front section The whole boiler drum is isolated with a stifling mineral isolation that reduces losses by sharing heat i...

Page 5: ...er Cleaning cover of the chimney pot Back part of the jacket with isolation Flange of the returnable water with a socket Elbow clearing plug Firebox door Medium section Ashtray Control handle of the smoky flap Thermomanometer Draught governor Upper part of the jacket with isolation Stoker door Stoker door closure Air rose Ash door Ash door closure Stifling Hanging pin Adjusting screw of the stifli...

Page 6: ...screw of the stifling Front section Boiler insertion Back section Three figure sump Flange of the heat water Smoky chimney pot Flat socket of the smoky chimney pot Smoky flap Lever Cleaning cover of the chimney pot Back part of the jacket with isolation Flange of the returnable water with a socket Elbow clearing plug Firebox door Medium section Ashtray Control handle of the smoky flap Medium secti...

Page 7: ... Concentration of total Fe Mn mg l 0 3 recommended value WARNING The use of anti freeze mixture is not recommended by the manufacturer a to the heating system ČSN 06 0310 Heating systems in buildings Designing and installation ČSN 06 0830 Heating systems in buildings protecting device CSN 07 0240 Warm water and low pressure steam boilers Basic regulations CSN 07 0245 Warm water and low pressure st...

Page 8: ...e materials polyurethane polystyrene polyethylene PVC The boiler placing with respect to the necessary handling space basic surroundings of AA5 AB5 according to ČSN 33 2000 1 ed 2 handling space of minimum 1000 mm in front of the boiler must be maintained a minimum distance of 400 mm between the back part of the boiler and the wall to maintain space for access to the back part of the boiler of min...

Page 9: ...s 3 x 26 1 piece split pin 2 5 x 32 1 piece washer 10 5 3 pieces bushings HEYCO 2 pieces blind flanges 6 pieces screws into metal C 4 8 x 13 4 pieces flange of heat water DN 50 1 piece flange of returnable water DN 50 with a socket Js 1 2 for impregnating and clearing plug 1 piece well of thermostat 1 piece sealing φ 90 x 60 x 3 2 pieces operating key 1 piece hook 2 pieces socket 8 mm 2 pieces boi...

Page 10: ...the well of thermostat into the hole in the top part of the rear section Fig 7 6 To put the stove pipe to the smoky chimney pot and penetrate it into the chimney hole 7 To screw the draught controller to the hole in the upper part of the front section 8 Two holes with a Js 6 4 thread in the front section to blind with Js 6 4 closures Fig 8 The boiler connecting dimensions 5 3 2 Jacket assembly 1 T...

Page 11: ...01 can be used for fill up The heat system is needed to be rinsed so as all impurities have been washed out During heat period it is necessary to keep consistent water volume in the heat system While filling up of the heat system with water it is necessary to prevent the air from leeching onto the system The water from boiler and heat system must never be impregnated or taken out for use except fo...

Page 12: ...CITE The optimal fuel is coke with granularity of 40 60 mm but it is possible to burn even coke and anthracite with granularity of 20 40 mm nut 2 In case of sufficient chimney draught 0 15 to 0 25 mbar it is possible to burn even non caking anthracite with granularity of 30 50 mm nut 1 and 50 80 mm cobbles WOOD Guarantee of clean and good combustion is to use only dry and wood in the natural state...

Page 13: ...n smaller quantity than during typical burning Coal will burn slower and with less intensiveness temperature will increase slower but it is a normal phenomenon As soon as a burning layer arises white smoke begins to decrease 10 As soon as the fuel passes to dark red glow it is necessary to close the throttle valve by about 1 2 mm and close the rosette of the stocking door 11 From this time you can...

Page 14: ... eventually coke when setting the boiler to the maximum operating temperature 9 IMPORTANT NOTICE 1 The boiler VIADRUS U 22 is not intended for the Czech market 2 The boiler only can be used for the purpose that it is destined for 3 The boiler must be operated only by adults who are introduced to these operating instructions It is unallowable to let children at the boiler unattended of adults Inter...

Page 15: ...er a consumer Mainly it is necessary to specify when and by whom the boiler was commissioned as well as it is necessary to specify a precise address of operation of the boiler VIADRUS a s provides the extended guarantee period for the boiler drum during 60 months from the sell by date but not longer than 66 months from the dispatch date of the product from the production plant The condition for re...

Page 16: ...70 and fossil fuel briquettes no no Other blend of biomass and fossil fuel no no Characteristics when operating with the preferred fuel Seasonal space heating energy efficiency ηs 75 Energy efficiency index EEI 74 Item Symbol Value Unit Item Symbol Value Unit Useful heat output Useful efficiency At rated heat output Pn 11 7 kW At rated heat output ƞn 75 3 At 30 50 of rated heat output if applicabl...

Page 17: ...ssil fuel briquettes no no Other blend of biomass and fossil fuel no no Characteristics when operating with the preferred fuel Seasonal space heating energy efficiency ηs 75 Energy efficiency index EEI 74 Item Symbol Value Unit Item Symbol Value Unit Useful heat output Useful efficiency At rated heat output Pn 17 7 kW At rated heat output ƞn 77 2 At 30 50 of rated heat output if applicable Pp kW A...

Page 18: ...fossil fuel briquettes no no Other blend of biomass and fossil fuel no no Characteristics when operating with the preferred fuel Seasonal space heating energy efficiency ηs 62 Energy efficiency index EEI 92 Item Symbol Value Unit Item Symbol Value Unit Useful heat output Useful efficiency At rated heat output Pn 20 kW At rated heat output ƞn 63 6 At 30 50 of rated heat output if applicable Pp kW A...

Page 19: ...fossil fuel briquettes no no Other blend of biomass and fossil fuel no no Characteristics when operating with the preferred fuel Seasonal space heating energy efficiency ηs 64 Energy efficiency index EEI 92 Item Symbol Value Unit Item Symbol Value Unit Useful heat output Useful efficiency At rated heat output Pn 25 kW At rated heat output ƞn 65 6 At 30 50 of rated heat output if applicable Pp kW A...

Page 20: ...fossil fuel briquettes no no Other blend of biomass and fossil fuel no no Characteristics when operating with the preferred fuel Seasonal space heating energy efficiency ηs 66 Energy efficiency index EEI 95 Item Symbol Value Unit Item Symbol Value Unit Useful heat output Useful efficiency At rated heat output Pn 30 kW At rated heat output ƞn 67 6 At 30 50 of rated heat output if applicable Pp kW A...

Page 21: ...fossil fuel briquettes no no Other blend of biomass and fossil fuel no no Characteristics when operating with the preferred fuel Seasonal space heating energy efficiency ηs 68 Energy efficiency index EEI 98 Item Symbol Value Unit Item Symbol Value Unit Useful heat output Useful efficiency At rated heat output Pn 35 kW At rated heat output ƞn 69 7 At 30 50 of rated heat output if applicable Pp kW A...

Page 22: ...fossil fuel briquettes no no Other blend of biomass and fossil fuel no no Characteristics when operating with the preferred fuel Seasonal space heating energy efficiency ηs 65 Energy efficiency index EEI 94 Item Symbol Value Unit Item Symbol Value Unit Useful heat output Useful efficiency At rated heat output Pn 40 kW At rated heat output ƞn 66 6 At 30 50 of rated heat output if applicable Pp kW A...

Page 23: ...fossil fuel briquettes no no Other blend of biomass and fossil fuel no no Characteristics when operating with the preferred fuel Seasonal space heating energy efficiency ηs 62 Energy efficiency index EEI 89 Item Symbol Value Unit Item Symbol Value Unit Useful heat output Useful efficiency At rated heat output Pn 45 kW At rated heat output ƞn 63 5 At 30 50 of rated heat output if applicable Pp kW A...

Page 24: ...fossil fuel briquettes no no Other blend of biomass and fossil fuel no no Characteristics when operating with the preferred fuel Seasonal space heating energy efficiency ηs 64 Energy efficiency index EEI 92 Item Symbol Value Unit Item Symbol Value Unit Useful heat output Useful efficiency At rated heat output Pn 49 kW At rated heat output ƞn 65 5 At 30 50 of rated heat output if applicable Pp kW A...

Page 25: ...kaging unit EN 13429 NO 3 1 Recovery by material recycling ensure recyclability in all terms of the standard for the functional packaging unit EN 13430 YES 3 2 Recovery in the form of energy ensure that calorific gain is achievable for the functional packaging unit EN 13431 YES Iron NO 3 3 Recovery by composting ensure compost ability in all terms of the standard for the functional packaging unit ...

Page 26: ...26 ...

Page 27: ... card for customer user Recording of performed warranty and after warranty repairs and performance of regular product check Recording date Performed operation Contractual service organization signature stamp Customer s signature ...

Page 28: ...VIADRUS U 22 C D VIADRUS a s Bezručova 300 E mail CZ 735 81 Bohumín info viadrus cz www viadrus cz ...

Reviews: