Boilers assembly
6.1
Boiler drum installation
1. Set up the e boiler drum on the bedding (see Fig. no 6).
2. Insert the sealing
∅
90 x 60 x 3 on the upper flanged part of the rear boiler section and bolt the flange of
heating water (see Fig. no 5) and connect the other end with the heating system.
3. Insert the sealing
∅
90 x 60 x 3 on the bottom flanged part of the rear boiler section and bolt the flange of
return water with a sleeve for the filling and discharge cock (see Fig. no 5) and connect the other end with
the heating system. In order to guarantee the boiler protection against low-temperature corrosion we
recommend to install a thermostatic valve in heating system (like ESBE TV 40).
4. For boiler connection to the heating system there must be screwed an elbow with filling and discharge
cock in the return water flange sleeve.
5. Set the smoke pipe on the smoke adapter and insert it into chimney opening
6. Threaded hole Js 6/4 "in the front boiler section is blinded with a plug Js 6/4" with sealing
∅
60 x 48 x 22.
7. By means of boiler putty are stuck 4 pieces of insulation according to Fig. no 5c into the stoking and ash
door.
Fig. no. 9
Connection dimensions at boiler