020806.01
31
vetus®
Installation instructions BOW PRO Series Thrusters: BOWA0651, BOWA0762 and BOWA0902
6 .2 Configuring the panels
If several panels are installed configuration is required.
6 .4 Configuring a panel for operating a bow thruster or a stern thruster
1
Place the panel in configuration mode, see 6.3.
6 .3 Place the panel in configuration mode
N.B. The panel must be in the OFF position (if the panel is NOT in the
OFF position, first press the On / Off button once to switch the panel
to the OFF position.
• Press and hold the On / Off button for 10 seconds.
During the first 6 seconds, the buzzer will continuously signal a didi-
didididi ..... (. . . .). Keep pressing the On / Off button. After 10 seconds
the buzzer sounds the signal dididididah (. . . - -). Now the panel is in
configuration mode.
6 .5 Configuring a panel for the steering position where the panel is placed
1
Place the panel in configuration mode, see 6.3.
n
ote
With a bow and stern thruster panel, together at the same helm station, the helm station number entered must be the same .
2
1
didahdi ( . − . )
1 x
BLUE
RED
1 x
1 x
2
4
5
3
3
1
2
didahdi ( . − . )
1 x
OR
Helm station
1
2
3
4
Helm station
1
2
3
4
1 BLUE, flashing
2 RED, flashing
3 BLUE, flashing
RED, quick flashing
4 BLUE and RED,
simultaneously flashing
2
4
5
The illustrated operations must be performed on EACH panel in-
stalled .
10 seconds
Configuration mode
6 seconds
3 seconds
dididididididid ( . . . . . . )
dididididah ( . . . . − )
ENGLISH