34
Installation Manual
Connecting the Vent Clip
Caution
To connect the exhaust vent frmly, must use the vent clip
included with boiler.
To connect the vent clip:
1
Connect the vent clip to the exhaust vent.
2
Connect the exhaust vent and the vent clip to the flue
connector.
3
Tighten the screws and fix the vent clip.
Vent Termination
Caution
•
Air intake must be protected from any debris.
•
When connecting the air intake connector and the flue
connector with the vent, connecting parts must be sealed
with PVC, glue and high temp silicon.
•
Maintain 12" (300 mm) min. (18" (450 mm) min. for Canada)
clearance above highest-anticipated snow level. Maximum
of 24" (600 mm) above roof.
•
Install a bird screen at the end of the intake air pipe and
exhaust pipe.
Determine what type of vent termination is appropriate for the
installation location and situation before installing the boiler.
The following subsections describe some venting configurations,
but do not include all possible options.
Single-pipe sidewall venting
3
Schedule 40 PVC Pipe
10" (254 mm) min.
12" (300 mm) min.
Caution
•
Maintain 12" (300 mm) min. (18" (450 mm) min. for Canada)
clearance above highest-anticipated snow level. Maximum
of 24" (600 mm) above roof.
•
Install a bird screen at the end of the intake air pipe and
exhaust pipe.
Notice
Single-pipe venting requires that adequate combustion air be provided
in end-use installations per NFPA 54 C.9.3.2.