3. Before inserting the cable in the clips, install the hold-down clips in pairs along the route as
shown in the following figure.
CAUTION: Do not allow the adhesive used on the hold-down clips to come in contact with the
leak-detection cable.
Figure 4.3 Hold-down clip installation
ITEM
DESCRIPTION
1
Install clips in pairs.
2
On a 90-degree turn, install 1 pair at the beginning of the arc and 1 pair at the end of the arc.
3
On straight sections, install 1 pair every 6 to 8 ft (1.8 to 2.4 m).
4
In a circular pattern, install 1 pair every 3 to 4 ft (0.9 to 1.2 m).
4. Allow the adhesive for the hold-down clips to dry completely, then snap the cable into each
clip.
5. Make sure that there are no gaps between the floor and the cable, adding clips as needed.
6. If necessary, make adjustments to the cable-layout diagram to represent the cabling "as-
installed." This diagram will be used to measure and map leak-detection landmarks when
testing the installation.
You are ready to connect the leak-detection cable to the controller. See
Vertiv
| Liqui-tect LP6000 Installer/User Guide |
13
Summary of Contents for Liqui-tect LP6000
Page 1: ...Liqui tect LP6000 Leak detection System Leak detection System Installer User Guide...
Page 18: ...Vertiv Liqui tect LP6000 Installer User Guide 18 This page intentionally left blank...
Page 20: ...Vertiv Liqui tect LP6000 Installer User Guide 20 This page intentionally left blank...
Page 34: ...Vertiv Liqui tect LP6000 Installer User Guide 34 This page intentionally left blank...
Page 60: ...Vertiv Liqui tect LP6000 Installer User Guide 60 This page intentionally left blank...
Page 74: ...Vertiv Liqui tect LP6000 Installer User Guide 74 This page intentionally left blank...
Page 76: ...Vertiv Liqui tect LP6000 Installer User Guide 76 This page intentionally left blank...
Page 80: ...Vertiv Liqui tect LP6000 Installer User Guide 80 This page intentionally left blank...
Page 81: ......