![Vertiv InstaRack LAN Assembly Instructions Manual Download Page 18](http://html1.mh-extra.com/html/vertiv/instarack-lan/instarack-lan_assembly-instructions-manual_1007966018.webp)
1.
2.
3.
4.
5.
18
Vertiv | Vertiv
InstaRack™
LAN
–
Montiert | 01.151.999.9.014 | Index
A | ECR
no.
18375 I 02/18
DEUTSCH
ENGLISH
• The top cover has cable entry points and covers for CoolBlast
®
fan unit which can be broken out if needed. Insert the flat-blade
screwdriver close to each connecting rib and break it out carefully
(Figure E). For cable entries on sides (D1) and covers in the middle
(D2), the sequence of breaking out the ribs is arbitrary. But for
front and rear cable entries (D3) the breaking out of the ribs must
be done in a sequence as shown on the Figure F.
• Der Deckel verfügt über herausbrechbare Kabeleinführungen und
Abdeckungen für CoolBlast
®
-Lüftereinheit. Bei Bedarf können
diese entfernt werden. Schlitzschraubendreher in der Nähe von
jedem Steg einstecken und vorsichtig ausbrechen (Bild E). Bei
seitlichen Kabeleinführungen (D1) und mittleren Abdeckungen
(D2) ist die Reihenfolge des Ausbrechens der Stege beliebig. Bei
vorderen und hinteren Kabeleinführungen (D3) muss das Ausbre-
chen der Stege in der Reihenfolge wie in Bild F erfolgen.
D
F
D1
D3
D3
D2
D2
E
D1
Deckel
Top cover