
13
2
LOCK
Arrow
PRESSURE REGULATOR INSTALLATION
STEP 1
Mount the 1/2” NPT (conical) male connector to the pressure regulator and
tighten by using a wrench.
Do not over tighten the connector.
Over tightening may crack regulator.
STEP 2
Assemble the 1/2” NPT con pressure regulator group to the extension pipe interposing the gasket supplied.
The regulator cover must be oriented toward the front side of the range.
IMPORTANT: use two wrenches to tighten the connection.
Fig. 2.3
Fig. 2.2
Regulator cover
Gasket
Summary of Contents for VEFSGE 304 SC
Page 23: ...23...