
5
Fit the pins on the back of the rail in the appropriate rack holes and push until
they click into place. Make sure that the lock is behind the rack post.
6
Push the blue tab toward the center of the rack until it clicks to lock the rail in
place.
7
Repeat the process with the second rail.
8
Verify that both rails are parallel and fastened securely and that they can pull
out to their full extension.
36
Installation procedures
Installing the appliance rack rails
Summary of Contents for 5250
Page 1: ...Veritas 5250 Appliance Hardware Installation Guide ...
Page 46: ...46 Installation procedures Connecting an appliance to more than one storage shelf ...
Page 47: ...47 Installation procedures Connecting an appliance to more than one storage shelf ...
Page 53: ...53 Installation procedures Connecting an appliance to more than one storage shelf ...
Page 151: ...V Veritas Remote Management interface accessing 70 151 Index ...